Northern Link (MTR)

Proposed Hong Kong MTR railway line From Wikipedia, the free encyclopedia

The Northern Link is a proposed commuter rail / rapid transit line of the MTR[1] system of Hong Kong which would connect the Tuen Ma line and the Lok Ma Chau Spur Line of the East Rail line. The link would also serve as a connection to the border checkpoint to mainland China for passengers to and from the western New Territories.[2] The Northern Link would start at Kam Sheung Road and end at Kwu Tung, with 3 intermediate stations.

Status
  • Phase 1: Under construction
  • Phase 2: Under construction
  • Spur Line: Under construction
Quick facts Northern Link 北環綫, Overview ...
Northern Link
北環綫
Overview
Status
  • Phase 1: Under construction
  • Phase 2: Under construction
  • Spur Line: Under construction
OwnerKowloon-Canton Railway Corporation
LocaleDistricts: Yuen Long, North, Futian
Termini
Connecting lines
 Line 7
 Line 9
 Line 20
Stations8
Service
TypeRapid transit
SystemMTR
OperatorMTR Corporation
DepotNgau Tam Mei Depot
History
Planned opening
  • Phase 1: 2027 (Kwu Tung station)
  • Phase 2: 2034
  • Spur Line: opens in 2034 with Phase 2
Technical
Line length16.9 km (10.5 mi)
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Route map

Kwu Tung     
proposed extension
proposed spur line to Huanggang Port
San Tin
Ngau Tam Mei
Au Tau
Kam Sheung Road     
Pat Heung Depot
Close
Hanyu PinyinBěi Huán Xiàn
Hanyu PinyinBěi Huán Xiàn
Quick facts Traditional Chinese, Simplified Chinese ...
Northern Link
Traditional Chinese北環綫
Simplified Chinese北环线
Transcriptions
Standard Mandarin
Hanyu PinyinBěi Huán Xiàn
Yue: Cantonese
Jyutpingbak1 waan4 sin3
Close

Other benefits for constructing this project are significantly shorter journey times for certain trips (for example, the Yuen Long to Fanling route would be reduced in length from 20 stations, running through Kowloon to 5 stations), significantly reducing costs for these trips, as well as relieving the large number of passengers using the East Rail line by diverting some passengers to the Tuen Ma line.

History

According to the Railway Development Strategy 2014, a shuttle service between Kam Sheung Road station and Kwu Tung station spanning 10.7 km (6.6 mi) was expected to begin construction in 2018 and be inaugurated in 2023.[3]

The initial line is expected to cost HK$62 billion in December 2015 prices, with an average of HK$500 million/km.[4][5]

Development of Northern Link as mentioned in the 2021 Policy Address, which a spur line and an extension would be built (outdated)

Phases

The Northern Link (NOL) project is expected to consist of four phases.

Phase 1

Phase 1 consists of the construction and completion of Kwu Tung station that will initially serve the East Rail line after its opening, then later the Northern Link after the completion of Phase 2. It had been partially built by KCR Corporation during the construction of the Lok Ma Chau Spur Line. Construction of Kwu Tung station was approved by the government in 2022, started construction in September 29, 2023[6], with completion due in 2027.[7]

The station was expected to cost HK$3.5 billion as of December 2015.[8][5] As of July 2023, the estimated cost had risen to HK$5.9 billion.[9]

Phase 2

Phase 2 consists of the building of the 10.7 km main line from Kam Sheung Road station to Kwu Tung station. It also includes the construction of 3 new stations (Au Tau, Ngau Tam Mei and San Tin) along with the expansion of Kam Sheung Road station to accommodate the new tracks and platforms. Planning and designing began in 2021. Construction of the mainline is planned to begin in 2025 and be completed in 2034.[10]

It is expected to cost HK$58.5 billion in December 2015 prices.[11][5]

The 5.8 km Northern Link Spur Line starts from San Tin station and connects to San Tin Technopole, Hong Kong-Shenzhen Innovation and Technology Park (station name is not confirmed) before terminating at the Huanggang Port in Shenzhen. In 2025, MTR has confirmed construction of both phase 2 and spur line to be completed together. Aiming to open no later than 2034.[12]

The 9.5 km eastern extension extends eastward from Kwu Tung to Ping Che via Lo Wu South and Man Kam To.[13] Originally planned as part of the extension, the section from Heung Yuen Wai to Fanling station will form the new 8.5 km Northeast New Territories Line.[14]

Stations

More information Livery, Station Name ...
Livery Station Name Interchange;
Adjacent transportation
Opening District
English Chinese
Phase 1
(Under construction)
Kwu Tung 古洞 2027 North
Phase 2
(Under construction)
Kam Sheung Road 錦上路 20 December 2003 Yuen Long
Au Tau 凹頭 2034
Ngau Tam Mei 牛潭尾
San Tin 新田
Northern Link Spur Line
(Under construction)
San Tin 新田 2034 Yuen Long
Chau Tau 洲頭
The Loop 河套
Huanggang Port 皇崗口岸
Futian
Eastern Extension
Lo Wu South 羅湖南 TBA North
Man Kam To 文錦渡
  • Through Border Checkpoint:
  • Shenzhen Metro Wenjin: 9
Hung Lung Hang 恐龍坑
Ping Che 坪輋
Close

References

Related Articles

Wikiwand AI