Ohio State Route 15
State highway in northwestern Ohio, US
From Wikipedia, the free encyclopedia
State Route 15 (SR 15) is a north–south and east–west route in northwestern Ohio. Its southern (eastern) terminus is at its interchange with U.S. Route 23/State Route 103 (US 23/SR 103) near Carey, and its northern (western) terminus is at the Michigan state line north of Pioneer, where the route continues in Michigan as M-99. The route is signed east–west from Carey to Bryan, and it is signed north–south from there to the Michigan state line.
US 68 in Findlay
I-75 in Findlay
US 224 in Findlay
US 127 near Bryan
US 6 near Bryan
US 20A near Montpelier

I-80 / I-90 / Ohio Turnpike in Holiday City
US 20 in Pioneer
| Route information | ||||
|---|---|---|---|---|
| Maintained by ODOT | ||||
| Length | 102.312 mi[1] (164.655 km) | |||
| Existed | 1926–present | |||
| Major junctions | ||||
| East end | ||||
| ||||
| North end | ||||
| Location | ||||
| Country | United States | |||
| State | Ohio | |||
| Counties | Wyandot, Hancock, Putnam, Defiance, Williams | |||
| Highway system | ||||
| ||||
| ||||
| ||||
SR 15 is an expressway for its southernmost 19 miles (31 km): two miles (3.2 km) where it runs concurrently with Interstate 75 (I-75), three miles (4.8 km) where it runs concurrently with US 68, and the final 14 miles (23 km) as a stand-alone limited-access road until its junction with US 23. The final 17 miles (27 km) are part of a heavily traveled[citation needed] corridor providing the most direct route between Detroit, Toledo, Findlay, Marion and Columbus.

History
SR 15 was certified in 1923, along the current US 322, which replaced it in 1926.[citation needed]
In 1926 the designation was reapplied to a route from Carey to the Indiana state line. In 1929 it was rerouted to Bryan, replacing parts of SR 9. It replaced the rest of SR 9 in 1931, rerouted along its current route to the Michigan state line.[citation needed]
In 1966, SR 15 was rerouted on an expressway from I-75 in Findlay to US 23 in Carey, its new southern (eastern) terminus. The highway runs a few miles south of its previous routing, which was recertified as SR 568 the same year.[citation needed]
Major intersections
| County | Location | mi[1] | km | Exit | Destinations | Notes |
|---|---|---|---|---|---|---|
| Wyandot | Carey | 0.000– 0.477 | 0.000– 0.768 | — | Interchange; eastern terminus of SR 15 | |
| Hancock | Vanlue | 4.558– 5.246 | 7.335– 8.443 | — | Interchange; southern terminus of SR 330 | |
| Marion Township | 9.696– 10.420 | 15.604– 16.769 | — | Interchange | ||
| Findlay | 13.695– 14.325 | 22.040– 23.054 | — | Eastern end of US 68 concurrency; interchange | ||
| 16.628– 16.773 | 26.760– 26.994 | — | Lima Avenue – Findlay | RIRO interchange | ||
| 16.842– 17.364 | 27.105– 27.945 | 156 | Southern end of I-75 concurrency; northern terminus of US 68 | |||
| 17.834– 18.428 | 28.701– 29.657 | 157 | ||||
| 19.578– 19.862 | 31.508– 31.965 | 159 | Northern end of I-75 concurrency; eastern end of US 224 concurrency | |||
| Blanchard Township | 24.351 | 39.189 | Southern terminus of SR 186 | |||
| 26.364 | 42.429 | |||||
| Putnam | Ottawa | 40.645 | 65.412 | Western end of US 224 concurrency; southern end of SR 65 concurrency; southern terminus of SR 109 | ||
| 41.120 | 66.176 | Northern end of SR 65/SR 109 concurrency | ||||
| Greensburg Township | 46.397 | 74.669 | Southern terminus of SR 108 | |||
| Palmer Township | 50.531 | 81.322 | Northern terminus of SR 115 | |||
| 51.094 | 82.228 | |||||
| Monroe Township | 55.551 | 89.401 | Northern terminus of SR 634 | |||
| Defiance | Defiance | 67.641 | 108.858 | Eastern end of SR 18 concurrency | ||
| 68.128 | 109.641 | Southern end of SR 66 concurrency | ||||
| 68.270 | 109.870 | Northern terminus of SR 111 | ||||
| 68.907 | 110.895 | Northern end of SR 66 concurrency | ||||
| 69.838– 69.948 | 112.393– 112.570 | Exit 25 (US 24) | ||||
| 71.186 | 114.563 | Northern end of SR 18 concurrency | ||||
| Ney | 79.837 | 128.485 | Eastern terminus of SR 249 | |||
| Williams | Pulaski Township | 83.348 | 134.136 | Southern end of US 127 concurrency; location of north–south/east–west direction change | ||
| 84.244 | 135.578 | Southern end of SR 2 concurrency | ||||
| Bryan | 86.514 | 139.231 | Northern end of SR 2 concurrency | |||
| 87.288 | 140.476 | Northern end of US 127 concurrency | ||||
| Jefferson Township | 94.303 | 151.766 | Southern end of US 20A concurrency; eastern terminus of SR 107 | |||
| Holiday City | 95.912– 96.202 | 154.355– 154.822 | Exit 13 on Ohio Turnpike | |||
| Madison Township | 97.970 | 157.667 | Northern end of US 20A concurrency | |||
| Pioneer | 99.773 | 160.569 | ||||
| Madison Township | 102.312 | 164.655 | Michigan state line | |||
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
| ||||||
