Olympic Stadium East station
Nanjing Metro station
From Wikipedia, the free encyclopedia
Olympic Stadium East station (simplified Chinese: 奥体东站; traditional Chinese: 奧體東站; pinyin: Àotǐ Dōng Zhàn), formerly Xiangxinglu station (向兴路站; 向興路站; Xiàngxīnglù Zhàn) during planning until 2007,[1] is a station of Line 2 of the Nanjing Metro. It started operations on 28 May 2010 along with the rest of Line 2.[2] On 30 September 2016 the station served a peak volume of 31,300 passengers.[3]
LocationMiddle Jiangdong Road (江东中路)
Jianye District, Nanjing, Jiangsu
China
Jianye District, Nanjing, Jiangsu
China
OperatorNanjing Metro Co. Ltd.
Line Line 2
Structure type
UndergroundThe platform at Olympic Stadium East in March 2021 | |||||||||||
| General information | |||||||||||
| Location | Middle Jiangdong Road (江东中路) Jianye District, Nanjing, Jiangsu China | ||||||||||
| Operator | Nanjing Metro Co. Ltd. | ||||||||||
| Line | Line 2 | ||||||||||
| Construction | |||||||||||
Structure type | Underground | ||||||||||
| Other information | |||||||||||
| Station code | 208 | ||||||||||
| History | |||||||||||
| Opened | 28 May 2010 | ||||||||||
| Services | |||||||||||
| |||||||||||
| |||||||||||
