Ouvrage Coume Annexe Sud

From Wikipedia, the free encyclopedia

ControlledbyFrance
Coordinates49°10′22″N 6°35′23″E / 49.17278°N 6.58972°E / 49.17278; 6.58972
InuseAbandoned
MaterialsConcrete, steel, deep excavation
Ouvrage Coume Annexe Sud
Part of Maginot Line
Northeast France
Block 3 with 81mm mortar embrasures on lower level
Site information
Controlled byFrance
Location
Ouvrage Coume Annexe Sud is located in France
Ouvrage Coume Annexe Sud
Ouvrage Coume Annexe Sud
Coordinates49°10′22″N 6°35′23″E / 49.17278°N 6.58972°E / 49.17278; 6.58972
Site history
In useAbandoned
MaterialsConcrete, steel, deep excavation
Battles/warsBattle of France
Ouvrage Coume Annexe Sud
Type of work:Small artillery work (Petit ouvrage)
sector
└─sub-sector
Fortified Sector of Boulay
└─Narbéfontaine
Work number:A32
Regiment:160th Fortress Infantry Regiment (RIF)
Strength:5 officers, 194 men

Ouvrage Coume Annexe Sud is a lesser work (petit ouvrage) of the Maginot Line. Located in the Fortified Sector of Boulay, the ouvrage consists of two infantry blocks, one artillery block and one observation block, and is located between petits ouvrages Coume and Mottemberg, facing Germany.

The site was surveyed by CORF (Commission d'Organisation des Régions Fortifiées), the Maginot Line's design and construction agency; Coume was approved for construction in May 1931. It was completed at a cost of 13 million francs.[1] The petit ouvrage[nb 1] was to receive a separate entry block in a second phase, never carried out.[4]

Description

Coume Annexe Sud comprises four infantry blocks, connected by underground galleries, with a small underground utility area and barracks.[4] The galleries are excavated at an average depth of up to 30 metres (98 ft). [5]

Casemates and shelters

In addition to the connected combat blocks, a series of detached casemates and infantry shelters surround Coume Annexe Sud, including

  • Casemate du Bisterberg Nord I: SIngle armored block with two mortar cloches and one GFM cloche.
  • Casemate du Bisterberg Nord II: SIngle block with one JM/AC47 embrasure, one JM embrasure and one GFM cloche.
  • Casemate du Bisterberg Sud III: SIngle block with one JM/AC47 embrasure, one JM embrasure and one GFM cloche.
  • Casemate du Bisterberg Sud IIII: SIngle block with one JM/AC47 embrasure, one JM embrasure and one GFM cloche.[4]

Manning

The 1940 manning of the ouvrage under the command of Captain Faucoulanche comprised 194 men and 5 officers of the 160th Fortress Infantry Regiment.[4] The units were under the umbrella of the 3rd Army, Army Group 2.[10] The Casernement de Ban Saint-Jean provided peacetime above-ground barracks and support services to Coume Annexe Sudand other positions in the area.[4][11]

History

See Fortified Sector of Boulay for a broader discussion of the Boulay sector of the Maginot Line.

Coume Annexe Sud played no significant role in either the Battle of France in 1940 or the Lorraine Campaign of 1944.

See also

Notes

References

Bibliography

Related Articles

Wikiwand AI