Oya Hybrid Power Station

From Wikipedia, the free encyclopedia

Official nameOya Energy Hybrid Facility
Coordinates32°49′23″S 20°17′57″E / 32.82306°S 20.29917°E / -32.82306; 20.29917
Oya Hybrid Power Station
Official nameOya Energy Hybrid Facility
CountrySouth Africa
LocationBreede Valley, Cape Winelands, Western Cape
Coordinates32°49′23″S 20°17′57″E / 32.82306°S 20.29917°E / -32.82306; 20.29917
StatusProposed
Construction beganH2 2024 expected
Commission dateH2 2026 expected
OwnerOya Energy
OperatorOya Energy
Solar farm
TypeFlat-panel PV
Power generation
Nameplate capacity333 megawatts (447,000 hp)

Oya Hybrid Power Station, also Oya Energy Hybrid Facility, is a hybrid power plant under development in South Africa. The power station comprises a 155 MW (208,000 hp) solar power plant, a 92 MW/242 MWh battery energy storage system (BESS), and an 86 MW wind power plant. The power station is owned and under development by a consortium of four independent energy companies. Under a 20-year power purchase agreement (PPA), the power generated here will be sold to Eskom, the national electricity utility company, for integration into the national grid.[1]

The power station would be located in the Western Cape Province of South Africa, straddling the border with Northern Cape Province, "between the towns of Ceres and Sutherland".[1]

Overview

In 2015, Renewable Energies began planning a stand-alone wind power station. Then a BESS was added. Later, as more equity partners were recruited, a solar power station was also added.[1] Through a synchronized mechanism, the hybrid power station is expected to provide a steady 128 MW of dispatchable power from 5am until 9.30pm every day. The single-point synchronization system is reported to employ AI and machine learning.[2][3]

Developers

The table below outlines the shareholding in the Oya Energy Hybrid Project. The special purpose vehicle company is Oya Energy. [1]

Oya Energy shareholding
RankShareholderDomicilePercentageNotes
1EngieFrance
35.0
[1]
2G7 Renewable EnergiesSouth Africa
20.0
[1]
3Meadows EnergySouth Africa
22.5
[1]
4Perpetua Investment HoldingsSouth Africa
22.5
[1]
Total
100.00

Timeline

The hybrid power station project reached financial close in February 2024. It was expected that construction will begin later that same year.[1][4]