Pampalarama Dam

From Wikipedia, the free encyclopedia

Official namePampalarama Dam
CountryBolivia
LocationLa Paz, Bolivia
Coordinates16°19′45″S 68°04′42″W / 16.3292°S 68.0783°W / -16.3292; -68.0783
Pampalarama Dam
Pampalarama Dam is located in Bolivia
Pampalarama Dam
Location of Pampalarama Dam in Bolivia
Official namePampalarama Dam
CountryBolivia
LocationLa Paz, Bolivia
Coordinates16°19′45″S 68°04′42″W / 16.3292°S 68.0783°W / -16.3292; -68.0783
PurposeDrinking water
StatusOperational
Construction beganJuly 14, 2017
Opening dateApril 4, 2019
Owner(s)Government of Bolivia
Water and Sanitation Social Public Enterprise
Dam and spillways
Type of damReinforced concrete
ImpoundsKhaluyo River
Height36 m (118 ft)
Length307 m (1,007 ft)
Reservoir
Total capacity3,405,952 m3 (2,761 acre⋅ft)
Surface area6.19 km2 (2 sq mi)
Normal elevation763 m (2,503 ft)

The Pampalarama Dam, or also known as Uma Punku, is a dam located in the Department of La Paz in Bolivia, which supplies water to the historic center of the city of La Paz. The infrastructure has a height of 36 m (118 ft) and a storage capacity of 3.4 million cubic metres of water. Its construction began on July 14, 2017, being inaugurated on April 4, 2019, during the third government of President Evo Morales.[1][2]

Drinking water shortages in La Paz and El Alto

The idea of the construction of the Pampalarama dam arises as a result of the urgent need of the cities of La Paz and El Alto to have access to the elemental and vital liquid, since it is worth remembering that in the month of November 2016, both cities they suffered the terrible scarcity of water for human consumption, this due to the low amount of said elemental liquid in the dams.[3]

On July 16, 2017, after inaugurating the Alto Hampaturi Dam, the President of Bolivia Evo Morales Ayma publicly announced the construction of another 3 more dams for the Department of La Paz, with the aim of guaranteeing water to the main cities.[3]

The start of the works for the construction of the Pampalarama dam began in July 2017 and it took around 21 months to finish building said infrastructure, finally being inaugurated on April 4, 2019, by President Evo Morales Ayma in an act public.[4][5]

Technical data