Pandaan–Malang Toll Road

Toll Road in East Java, Indonesia From Wikipedia, the free encyclopedia

Pandaan–Malang Toll Road is a controlled-access toll road in East Java, Indonesia. This 38.48-kilometre (23.91 mi) highway connects Malang city with Pandaan of Pasuruan Regency.[1] The toll road will reduce traffic movement of arterial roads and national roads, which facilitates industrial transportation to Malang and Batu city. The toll road reduced the travel time of Pandaan-Pasuruan-Malang to less than an hour.[2][3]

Length38.48 km (23.91 mi)
Existed2018–present
NorthendPandaan
Major intersections
Quick facts Route information, Length ...
Pandaan–Malang Toll Road (MAPAN)
Ruas Tol Pandaan-Malang..jpg
Section III of Pandaan Malang Toll Road.
Route information
Part of AH2
Maintained by PT Jasamarga Pandaan Malang
(PT Jasa Marga Tbk, PT Pembangunan Perumahan Tbk, PT Sarana Multi Infrastruktur)
Length38.48 km (23.91 mi)
Existed2018–present
Major junctions
North endPandaan
Major intersections
South endMalang
Location
CountryIndonesia
Major cities
Highway system
Close

History

This toll road has built in 2016. In March 2017, land acquisition for this toll road is only 67%. Construction was hampered by the discovery of a historical site dating back to the Singhasari Kingdom in March 2019 in section 5 of the 37th kilometer, Dusun Sekaran, Sekarpuro Village, Pakis District, Malang Regency, so the toll road was shifted eight meters to the banks of the Amprong River. The 30.62-kilometer sections I, II, and III connecting Pandaan and Singosari were inaugurated by President Joko Widodo on 13 May 2019. The 4.75-kilometer Section IV connecting Singosari and Pakis has been in operation since November 1, 2019. Meanwhile, the 3.11-kilometer section V between Pakis and Madyopuro began operating on April 7, 2020.

Sections

Pandaan-Malang toll road is divided into five sections,[4]

  • Section I: Pandaan-Purwodadi is 15.47 km
  • Section II: Purwodadi-Lawang 8.05 km
  • Section III: Lawang-Singosari 7.10 km
  • Section IV: Singosari-Pakis 4.75 km
  • Section V: Pakis-Malang 3.11 km

Exits

More information Province, Location ...
ProvinceLocationkmmiExitNameDestinationsNotes
East JavaPandaan, Pasuruan Regency56.034.8 Gempol–Pandaan Toll Road
56.635.256 (798)Pandaan Toll Gate
Northern Terminus
Purwodadi, Pasuruan Regency72.244.972 (814)Purwodadi Toll Gate
Lawang, Malang Regency79.949.680 (822)Lawang Toll Gate
Singosari, Malang Regency88.154.788 (830)Singosari Toll Gate
Pakis, Malang Regency93.057.893 (835)Pakis Toll Gate
Kedungkandang, Malang96.059.796 (838)Malang Toll GateSouthern terminus
96.459.9 Malang–Kepanjen Toll Road
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
  •       Route transition
  •       Unopened
Close

References

Related Articles

Wikiwand AI