Wikiwand AI

Penzance railway station

Railway station in Cornwall, England From Wikipedia, the free encyclopedia

Penzance railway station (Cornish: Pennsans) serves the town of Penzance in west Cornwall, England. It is the terminus of the Cornish Main Line and the southernmost railway station in Great Britain, situated at milepost 326.5 miles (525.5 km) from London Paddington.[2] The station is owned by Network Rail and managed by Great Western Railway, which also operates train services together with CrossCountry. It is the southernmost railway station in Great Britain.[3][4][5]

LocationPenzance, Cornwall
England
Coordinates50.122°N 5.533°W / 50.122; -5.533
Quick facts PenzancePennsans, General information ...
Penzance

Pennsans
National Rail
General information
LocationPenzance, Cornwall
England
Coordinates50.122°N 5.533°W / 50.122; -5.533
Grid referenceSW475306
ManagerGreat Western Railway
Platforms4
Other information
Station codePNZ[1]
ClassificationDfT category C1
History
Original company
West Cornwall Railway
Pre-groupingGreat Western Railway
Post-groupingGreat Western Railway
Key dates
Opened1852
Passengers
2020/21Decrease 0.190 million
 Interchange 1,370
2021/22Increase 0.516 million
 Interchange Increase 4,472
2022/23Increase 0.565 million
 Interchange Decrease 2,604
2023/24Increase 0.619 million
 Interchange Increase 4,446
2024/25Increase 0.685 million
 Interchange Increase 4,548
Location
Notes
Passenger statistics from the Office of Rail and Road
Close

The first station opened in 1852; through travel to and from London commenced from 1859, with the opening of the Royal Albert Bridge. The station was rebuilt by the Great Western Railway in 1876 and the current layout was the result of a further rebuilding in the 1930s.

History

Broad gauge era

The station was opened by the West Cornwall Railway on 11 March 1852[6] as the terminus of its line from Redruth. The station itself consisted of a single platform face, and along with the rest of the West Cornwall Railway was laid as standard gauge.[7] This changed in 1866 when the West Cornwall Railway was relaid to mixed gauge allowing South Devon Railway Leopard class locomotive Lance to bring in the first broad gauge train which carried dignitaries from Truro,[7] although the small station with the single platform remained with little other alteration. A siding extended beyond the goods shed and ran along Albert Quay.[8]

In 1876, the Great Western Railway took over the West Cornwall Railway and a major redevelopment was undertaken. An enlarged goods shed was built and the wooden passenger buildings were replaced by a much larger station built in rock-faced granite[9] to a design by William Lancaster Owen. The total cost was around £15,000 (equivalent to £1,610,000 in 2025)[10] which included the 250ft by 80ft roof which cost £5,000 for the iron and the 50 tons of glass.[11] The new station had the booking office at street level, with the two platforms linked by a staircase,[8] and was used for the first time on 18 November 1879.[12] However, the new station suffered from teething problems because, by 1880, it was reported that some settlement in the masonry and shrinkage of the iron in the roof had caused several sheets of the glazing to break.[13]

The blocked-up archway in the wall that retains the hillside behind the platforms was used by the railway as a coal store.

In 1892, station was converted from broad gauge to standard gauge. At the same time, work was undertaken to widen and extend both the two platforms, and a fourth road was laid in the station.[8]

After 1892

Inside the second station c. 1915, a Steam Rail Motor waits to depart

Following grouping, about 60 staff were employed at Penzance station by the 1930s. In 1937, the GWR were granted permission to reclaim land from the sea, permitting a significant enlargement of the station with the capacity being doubled with two platforms providing four platform faces, three of which were under the main roof.[14]

The last British Railways steam train to Penzance was a railtour hauled by West Country class 34002 Salisbury on 3 May 1964.[15]

The WCR station had a disc-and-crossbar signal on the end of the single platform; this was common on the GWR and associated companies.[7] This was replaced by the familiar semaphore signals, and these were replaced in turn by colour light signals in 1982.[15]

Further alterations were made in 1983, when a new ticket office and buffet were opened.[16] The 1983 refurbishment also included the replacement of the lantern roof with a different design.[note 1][17]

The longest distance train service in the United Kingdom for many years ran from Aberdeen to Penzance with a journey time of around 13 hours.[18] Since May 2025 the service only runs between Aberdeen and Plymouth.[19]

In 2012–13, the station's roof was refurbished.[20]

More information Preceding station, Historical railways ...
Preceding station Historical railways Following station
Terminus   Great Western Railway
Cornish Main Line
  Marazion
Close

Layout

The station layout

Platforms 1, 2 and 3 are within the main train shed; platform 4 is on the south side, in the open air. A large stone at the end of this platform welcomes people to Penzance in both English and Cornish. This side of the station is built on the sea wall near the harbour; the other side is cut into the hillside.

There is only one line between the station and Marazion. There were two tracks until 1974 but now trains in both directions use the former down line (closest to the sea) while the former up line is only used as a siding for access to Ponsandane sidings and Long Rock Depot.[21]

As the western terminus of the Night Riviera service from London Paddington, the station has a sleeper lounge and a shower room to the northern end of the concourse, as well as waiting rooms and two cafes on the concourse. There is also an information point on platform 3.[22]

Passenger volume

Penzance is the second busiest station in Cornwall; Truro is the busiest, with more than twice the number of passengers. Comparing the year from April 2011 to that which started in April 2002, passenger numbers increased by 48%.[23]

More information 2004–05, 2005–06 ...
Passenger volume at Penzance[24]
2004–05 2005–06 2006–07 2007–08 2008–09 2009–10 2010–11 2011–12 2012–13 2013–14 2014–15 2015–16 2016–17 2017–18 2018–19 2019–20 2020–21 2021–22 2022–23 2023–24 2024–25
Entries and exits 403,000 413,905 461,764 498,290 526,132 520,982 556,546 580,238 562,992 533,258 549,730 543,036 560,338 568,836 570,098 573,718 190,426 515,600 564,724 618,956 685,470
Interchanges 2,132 748 699 365 49 200 22 117 108 32 172 174 17 1,384 1,598 4,226 1,370 4,472 2,604 4,446 4,548
Close

The statistics cover twelve month periods that start in April.

Services

A CrossCountry Super Voyager at platform 4

Penzance is the western terminus of the Cornish Main Line; it is served by two train operating companies:

More information Preceding station, National Rail ...
Preceding station National Rail National Rail Following station
Terminus   Great Western Railway
Cornish Main Line
  St Erth
  CrossCountry
Cornish Main Line
 
Close

Freight and mail

Penzance in 1958 showing the freight area beyond platform 4

The WCR station had both a goods shed and a locomotive shed between the passenger station and the sea; when a fire destroyed the goods shed in 1876,[27] the building was enlarged considerably incorporating the original locomotive shed[7] which had been replaced by one on the opposite side of the line near the end of the retaining wall, which in turn was replaced by the new Penzance Traction Maintenance Depot outside the station at Long Rock. In the first decade of the 20th century, Penzance was typically handling 45,000 tons of goods each year.[8]

In November 1882, there were complaints about the paving, rail tracks and the difficulty for traffic to pass on the Albert Pier. The Borough Council requested the Railway Company to replace the paving with granite setts before relaying the rails.[28]

When the expansion of 1937 doubled the number of platform faces, the fourth face was outside the overall roof; this was used for mail and parcels traffic as access to the road was provided.[14]

Cultural references

The station was featured in Episode 1 of All the Stations in 2017, the first station that presenters Geoff Marshall and Vicki Pipe visited on their journey.[29][30]

Notes

  1. One source[clarification needed] The new roof failed to vent diesel fumes from the trains to the necessary safety standard, meaning passengers had to alight outside the concourse. gives the date of the new roof as 1990

References

Bibliography

Related Articles

Timelines

Top Qs

Fact Checks