Pioneer Trail Wind Farm
From Wikipedia, the free encyclopedia
CountryUSA
StatusActive
Constructionbegan2011
| Pioneer Trail Wind Farm | |
|---|---|
![]() | |
| Country | USA |
| Coordinates | 40°27′22.9″N 87°58′42.6″W / 40.456361°N 87.978500°W |
| Status | Active |
| Construction began | 2011 |
| Owner | RWE |
| Operator | RWE |
| Wind farm | |
| Type | Onshore |
| Hub height | 400 ft |
| Power generation | |
| Units operational | 94 x 1.6 mW |
| Make and model | GE Renewable Energy |
| Storage capacity | 150.4 MW |
The Pioneer Trail Wind Farm is a 94-turbine wind farm, established in 2011, in Ford County and Iroquois County in Illinois.[1] The wind farm is headquartered in the Ford County seat of Paxton.[2]
