Wikiwand AI

Pitlochry railway station

Railway station in Perth and Kinross, Scotland From Wikipedia, the free encyclopedia

Pitlochry railway station is a railway station serving the town of Pitlochry in Perth and Kinross, Scotland. It is managed by ScotRail and is located on the Highland main line, 28 miles 21 chains (45.5 km) from Perth, between Dunkeld & Birnam and Blair Atholl.[4]

LocationPitlochry, Perth and Kinross
Scotland
Coordinates56.7023°N 3.7353°W / 56.7023; -3.7353
ManagerScotRail
Quick facts General information, Location ...
Pitlochry

Scottish Gaelic: Baile Chloichridh[1]
National Rail
General information
LocationPitlochry, Perth and Kinross
Scotland
Coordinates56.7023°N 3.7353°W / 56.7023; -3.7353
Grid referenceNN938580
ManagerScotRail
Platforms2
Other information
Station codePIT[2]
Key dates
1863Opened
Passengers
2020/21Decrease 22,450
2021/22Increase 84,374
2022/23Increase 0.106 million
2023/24Increase 0.125 million
2024/25Increase 0.131 million
Listed Building – Category A
Designated12 October 1994
Reference no.LB39867[3]
Location
Notes
Passenger statistics from the Office of Rail and Road
Close

History

The station is situated on the former Inverness and Perth Junction Railway (I&PJR) and was opened along with the line in 1863.[5] In 1865, The I&PJR amalgamated with other railways to create the Highland Railway.[6]

In 1897 the building on the north-bound platform was replaced with a more substantial building to the designs of the Engineer in Chief to the Highland Railway, William Roberts.[7] The main block on the south-bound platform received an addition in order to extend the booking office and the stationmaster’s rooms.[8]

Launched in 2015, Pitlochry is one of the eight station members of the Highland Main Line Community Rail Partnership.[9]

Facilities

There are waiting rooms on both platforms, benches and help points on both platforms, with a small car park, ticket office and toilets available on platform 1. Access to both platforms is step-free (from the car park for platform 1 and a drop-off point for platform 2), but the only way of crossing over is via the footbridge.[10] There is a staffed ticket office open throughout the day, however, there are no self-service ticket machines.[11]

Pitlochry Station Bookshop

In 2006, Pitlochry Station Bookshop was opened in an unused part of the station building via ScotRail's Adopt a Station programme. The shop sells second-hand books and donates almost all of its takings to a set of charities, which is made possible by ScotRail not charging rent for the premises and the shop being entirely staffed by volunteers. As of 2026 the shop has donated over £500,000.[12][13]

Platform layout

The station has a passing loop 25 chains (500 m) long, with two side platforms. Platform 1 on the southbound line could accommodate trains having eight coaches, whereas platform 2 on the northbound line could hold eleven.[14] Both platforms were extended in March 2019 as part of a £57 million upgrade programme by Network Rail, which also saw the station re-signalled.[15]

Passenger volume

More information 2004–05, 2005–06 ...
Passenger Volume at Pitlochry[16]
2004–05 2005–06 2006–07 2007–08 2008–09 2009–10 2010–11 2011–12 2012–13 2013–14 2014–15 2015–16 2016–17 2017–18 2018–19 2019–20 2020–21 2021–22 2022–23 2023–24 2024–25
Entries and exits 84,555 88,638 78,193 78,776 82,784 87,210 87,684 90,618 98,340 101,902 112,496 121,168 121,342 125,264 125,006 121,060 22,450 84,374 105,586 125,486 131,400
Close

The statistics cover twelve month periods that start in April.

Services

A Class 43 high-speed train at platform 1, going north

In the May 2026 timetable, all Highland main line services between Perth and Inverness call here. From Monday to Saturday, there are six trains each weekday to Edinburgh Waverley (including the Highland Chieftain to London King's Cross) and to Glasgow Queen Street southbound. Northbound there are twelve departures to Inverness. On Sundays there are five trains to Edinburgh (including the King's Cross service) and two to Glasgow, along with seven to Inverness, two of which extend to Elgin. The Caledonian Sleeper to London Euston picks up passengers here, six nights per week.[17]

More information Preceding station, National Rail ...
Preceding station National Rail National Rail Following station
Dunkeld & Birnam
or Perth
  London North Eastern Railway
East Coast Main Line
  Blair Atholl
or Kingussie
  ScotRail
Highland Line
  Blair Atholl
or Dalwhinnie
or Newtonmore
or Kingussie
Dunkeld & Birnam   Caledonian Sleeper
Highland Caledonian Sleeper
  Blair Atholl
  Historical railways  
Ballinluig
Line open; station closed
  Highland Railway
Inverness and Perth Junction Railway
  Killiecrankie
Line open; station closed
Close

Future proposals

This station is planned to benefit from a package of timetable enhancements introduced by Transport Scotland and Scotrail. The current Perth to Inverness timetable will increase to hourly each way, with trains south of there running on alternate hours to Edinburgh and Glasgow. Journey times will be reduced by 10 minutes to both cities.[18] As of May 2026, this has still not taken place.[19]

See also

References

Related Articles

Timelines

Top Qs

Fact Checks