Wikiwand AI

Springfield line

Passenger rail service in Queensland, Australia From Wikipedia, the free encyclopedia

The T2 Springfield Central line is an interurban commuter railway line in South East Queensland, Australia. Operated by Queensland Rail, the line runs for 28.8 kilometres (18 miles) from Springfield Central to Roma Street, where services continue on the Redcliffe Peninsula line.

Track length16.0 km (9.9 mi)
Number of tracksQuadruple to Darra, double track to Springfield Central
Track gauge1,067 mm (3 ft 6 in)
Quick facts Overview, Website ...
Springfield Central line
Overview
Website
Technical
Track length16.0 km (9.9 mi)
Number of tracksQuadruple to Darra, double track to Springfield Central
Track gauge1,067 mm (3 ft 6 in)
Electrification2013
Operating speed140 km/h (87 mph)
Route map
Springfield Central line
Exhibition line
2.7 km
Bowen Hills
(1)
1.3 km
Fortitude Valley
(1)
0.0 km
Central
(1)
0.8 km
Roma Street
(1)
Hale Street (Inner City Bypass)
2.3 km
Milton
(1)
3.5 km
Auchenflower
(1)
4.5 km
Toowong
(1)
6.0 km
Taringa
(1)
7.4 km
Indooroopilly
(1)
8.5 km
Chelmer
(1)
9.5 km
Graceville
(1/2)
10.7 km
Sherwood
(2)
Yeerongpilly via Tennyson Line
(closed to commuter rail)
11.6 km
Corinda
(2)
13.3 km
Oxley
(2)
16.0 km
Darra
(2)
Ipswich/Rosewood line
Ipswich Motorway
Richlands (2)
Progress Road
Ellen Grove (proposed station) (3)
Logan Motorway
Centenary Highway
27.3 km
Springfield (3)
29.6 km
Springfield Central (3)
Close

The line speed is rated for speeds of up to 140 km/h (87 mph) in most sections. However, only the interurban multiple unit 100 and 120 series and New Generation Rollingstock trains can run at the full speed of the line. The current timetable is based on a top speed of 120 km/h (75 mph) between Richlands and Springfield stations, which is faster than the Centenary Motorway that runs alongside.

Services on this line are the busiest on the Brisbane network.[1]

Construction and opening

refer to caption
Richlands railway station, 2011

Construction of the first stage of the line, to Richlands, started on 5 July 2010, with the first sleeper being laid at Darra on the Ipswich line.[2] The line was developed along with the widening of the nearby Centenary Motorway from two to four lanes from Darra through to the Logan Motorway.[3] The original completion date was for 2015.[4] However this was bought forward to 2013.

Construction of the first station on the line, Richlands, started on 1 July 2008 (2008-07-01),[5] and the line was due to begin service on 23 January 2011 (2011-01-23) without service from Darra to the City due to scheduled maintenance works on the Ipswich line.[6]

The opening was brought forward to 17 January 2011 (2011-01-17) to assist travellers from further west who could not use the Ipswich line, which was out of service due to Queensland floods.[7]

On 23 October 2011 (2011-10-23), work started on the second stage of the line to Springfield. The station originally proposed as Springfield Lakes station was renamed Springfield, and the one proposed as Springfield station renamed Springfield Central.[8]

The extension to Springfield Central began service on 2 December 2013.

A proposal exists to extend the line from its present terminus at Springfield Central to Redbank Plains,[9] Ripley Valley, Yamanto, and Ipswich station.[10]

On 10 August 2026, the Springfield line was numbered T2 (along with the Kippa-Ring line) and renamed the Springfield Central line.[11][12]

Network and operations

Route

Springfield railway line viaduct
Over 800 metres long, the railway viaduct has piers designed to allow for the planned expansions of nearby Logan and Centenary Motorways.

Passengers would change for or from the Ipswich and Rosewood lines at Darra; Beenleigh, Gold Coast and Cleveland lines at Roma Street; and all other lines at Central.

The route crosses the interchange between the Logan Motorway and Centenary Motorway on a two-track viaduct more than 800 metres (2,600 ft) long. The viaduct has been designed so that its piers do not obstruct planned expansions of both roads.[13]

Stations

More information Station, Image ...
Station Image Suburb Opened Terrain Time[a]
Roma Street
Brisbane 14 June 1875 Ground level 0
Milton
Milton 1884 Ground level 3
Auchenflower
Auchenflower 1887 Ground level 5
Toowong
Toowong 1875 Underground 7
Taringa
Taringa 1875 Ground level 10
Indooroopilly
Indooroopilly 1875 Ground level 12
Chelmer
Chelmer 1881 Ground level 14
Graceville
Graceville 1876 Ground level 16
Sherwood
Sherwood 1874 Ground level 18
Corinda
Corinda 1875 Ground level 20
Oxley
Oxley 1874 Ground level 23
Darra
Darra 1874 Ground level 26
Richlands
Richlands 17 January 2011 Ground level 30
Springfield
Springfield 12 December 2013 Below ground 36
Springfield Central
Springfield Central 12 December 2013 Elevated 39
Close

Proposed extensions

More information Extensions proposed in the Connecting SEQ 2031 plan ...
Extensions proposed in the Connecting SEQ 2031 plan
Continues to Darra and Brisbane City
(3)
Augusta Parkway
Augustine Heights
(3)
Redbank Plains
(3)
Swanbank
(3)
South Ripley
(3)
Ripley
(3)
Deebing Heights
(3)
Cunningham Highway
Yamanto
(3)
Warwick Road
Churchill
(3)
(3)
Brisbane Street
Main Line to Rosewood Station
(3)
Continues to Darra and Brisbane City
Close

In the Connecting SEQ 2031 Plan, the QLD Government has listed an UrbanLink high frequency (15min) service running from Darra to Springfield, and on to Redbank Plains via Augustine Heights, as an extension to the existing line. It also talks about an ExpressLink (30min frequency) between Ipswich and Ripley, via UQ Ipswich (now USQ Ipswich), Churchill, Yamanto and Deebing Heights; with the vital corridor between Ripley and Redbank plains being reserved for a later time after 2031. In 2019, the City of Ipswich completed an overview of the Ipswich Central to Springfield Central public transport corridor with a focus on the proposed extension.[14]

The lines are shown in the map below.[15]

See also

Notes

  1. Travel time in minutes from Roma Street.

References

Related Articles

Timelines

Top Qs

Fact Checks