Reftinskaya GRES
From Wikipedia, the free encyclopedia

Reftinskaya GRES is the largest solid fuel thermal power plant in Russia.[1] It is situated in Sverdlovsk Oblast, 100 km north-east of Yekaterinburg and 18 km from Asbest. Reftinskiy town, which is home to 18,000 people, is situated 2.5 km from the GRES, which produces 20,000 million KWh annually. It has a total installed capacity of 3,800 and heat power 350 GKh.[clarification needed] Coal from Ekibastuz's coal field (16,3 МJ/kilo of calorific value, ash content for moisture-free fuel is 43,3 %) is used as the main fuel and the black oil is used as the starting fuel. GRES produces power with the bar «Outdoor switchgear -500 kV» on five power lines -500 kV and with the bar «Outdoor switchgear -220 kV» on five power lines -220 kV. The station supplies power to the industrial areas in Sverdlovsk, Tyumen, Perm and Chelyabinsk regions. The construction of the electric power station was started in 1963, the launching of the first power unit took place in 1970 and the last one in 1980.
The building of the electric power plant was started in 1963 and it was realized in 2 lines: first, 6 power units with installed capacity of 300 MW with the direct-flow two-furnace boilers with rating 950 ton/hour were launched and secondly – 4 power units with installed capacity of 500 MW with the direct-flow two-furnace boilers with rating 1650 ton/hour.
Reftinskaya GRES uses coal supplied from Ekibastuz that has calorific power of 3800–4100 cal/kg, ash content for moisture-free fuel of 40–43% and humidity of 6–9%.
On 3d July, 1963 the group of the formers landed in the suburbs of Asbest and, getting through the taiga jungle, went to research the ground for the building of electric power station that ought to become the leader of the ural energy providers. In the same year Yurii Yelovikov hammered the first peg on the territory of the Reftinskaya GRES.
The building of electric power station was one of the most important construction in the region, thus Sverdlovsk regional committee headed by B.Yeltsin controlled its realization.
The design work of the Reftinskaya GRES was given to the Ural branch of industry institute “Teploenergoproject”. The collective of the institute has been developing from the implementation of the electrification plan and projected all electro stations of the Great Ural, accumulated big experience. The most successful technological decisions of that period and of the whole world were entered in the project of the Reftinskaya GRES.
In March, 1967 the first cubic meter of the concrete for the main building's base was placed. The process of building achieved a good pace of work. One by one objects of the first unit, which had power of 300 MW, came to life.
After the series of control and testing of boiler and turbine, the first unit was plugged in on 24 December 1970.and immediately started to work fully operational. The principle of the unit's maximum work after the building was preserved on all next 9 units with the installed capacity of 300–500 MW that would annually be launching until the out of planned production capacity in 1980.
Unit No. 1 was taken for the exploitation on 28 December 1970 by the state commission under the chairman of V. Trachyk. the counting of the electro station's vital activity started definitely from this moment. Units No.2 and No.3 were taken for exploitation in 1971. unit No.4 was introduced The following year. In September 1974 unit No.5 was introduced. And in May 1975 unit No.6 was introduced. The power of the electric station reached 1800 MW.
It was not profitable To continue the building of the units with the installed capacity of 300 MW. The decision to enlarge Reftinskaya GRES due to “pyatisotka” was taken.
Literally by one year the base of all 4 objects was prepared. Hardly had the unit No.7 been accepted by state commission in the end of 1977, when the butt-end's steel-work of the eighth unit got up. The next units No.8 and No.9 with the capacity of 500 MW were correspondingly introduced in the end of 1978 and 1979. The last (tenth) power unit was launched on 21 December 1980. And on 22 December 1980 in the occasion of the GRES building termination and achievement of the final planned production capacity of 3800 MW, the mass meeting took place, where the first secretary of the Sverdlovsk regional committee C.P.S.U. B. Yeltsin congratulated power men and presented governmental rewards more than 200 constructors, fitters, operatives. The rank of the Hero of Socialist Labour was appropriated to the Chef of the Reftinskaya GRES Building Government I. Volfson It was the first time in the country when on the coal-dust unit of 500 MW at Reftinskaya GRES was introduced the automated control system in 1997. So the conception of reconstruction and development of automated control system of country electric power stations, which was cultivated in Sverdlovenergo, started to be realized. Fundamentally new, unprecedented on coal-dust units technology made work place of machinist more comfortable (panels were replaced by 8 monitors) and supplied personnel with the great quantity of information.[2]
The part of produced on Reftinskaya GRES energy from the total volume of energy, consumed by Sverdlovsk Oblast, contains nearly 40%. Relatively, almost every second electric light bulb in the Sverdlovsk Oblast's households works on the electricity, generated by Reftinskaya GRES. The electric power station provides with electricity consumers from Ural region with the power output of Economic Cooperation Organization of Russia.
On 24 September 2008 at 07:05 GRES generated 700-billionth kWh of energy. In 2010 public audition in the case of the transition GRES on shot line ash removal took place. The administration of the station got claims of absence of the ecological examination of the project and pedaling o administrative resource, in view of the potential environmental pollution.[3]
The chimney No. 4 of Reftinskaya GRES with the height of 330 meters is one of the highest chimneys in the world.[4]
Reftinskaya GRES has been in operation by JSC Kuzbassenergo since July 1, 2020 after being transferred from Enel.[5]