Rostov Nuclear Power Plant

Nuclear power plant in Volgodonsk, Russia From Wikipedia, the free encyclopedia

The Rostov Nuclear Power Plant (Russian: Ростовская АЭСⓘ), also known as the Volgodonsk Nuclear Power Plant (Russian: Волгодонская АЭСⓘ), is a Russian nuclear power plant located on the left bank of Tsimlyansk Reservoir in the lower stream of the Don river near Volgodonsk, Rostov Oblast.[1]

Official nameРостовская атомная электростанция
CountryRussia
LocationVolgodonsk
Coordinates47°35′57.63″N 42°22′18.76″E
Quick facts Official name, Country ...
Rostov Nuclear Power Plant
Spray ponds and units 1 & 2 of the Rostov Nuclear Power Plant
Official nameРостовская атомная электростанция
CountryRussia
LocationVolgodonsk
Coordinates47°35′57.63″N 42°22′18.76″E
StatusOperational
Construction began1977
Commission date2001
OperatorRosenergoatom
Nuclear power station
Reactor typeVVER-1000/320
Reactor supplierAtomstroyexport
Power generation
Units operational3 × 1,000 MW
1 × 1,030 MW
Make and modelKharkov Turbine Plant
Electrosila
Nameplate capacity4,030 MW
External links
WebsiteRostov NPP
CommonsRelated media on Commons
Close

Construction of Rostov reactor No. 1 began in 1977 and operations began in 2001. Construction of reactor No. 2 commenced in 1983 and finished in 2010. Unit 3 was connected to the electrical grid for the first time in December 2015.[1] Unit 4 underwent first criticality on 7 December 2017,[2] and put into commercial operation on 28 September 2018.[3] Units 3 and 4 are of an upgraded VVER-1000/320 subtype.[4]

The post–Soviet Union revival of the nuclear industry of Russia took place at Rostov in the early 2000s, with the completion of the building of unit 2 in 2010, unit 3 in 2015 and unit 4 in 2017. Unit 4 was the last VVER-1000/V-320 reactor built.[5]

Reactors

More information Unit, Reactor type ...
Unit Reactor type Net
capacity
Gross
capacity
Construction
started
Commercial
operation
Shutdown
Rostov 1 VVER-1000/320 950 MW 1000 MW 1 September 1981 25 December 2001 -
Rostov 2 VVER-1000/320 950 MW 1000 MW 1 May 1983 10 December 2010 -
Rostov 3[6] VVER-1000/320 950 MW 1000 MW 15 September 2009 17 September 2015 -
Rostov 4[7] VVER-1000/320 1011 MW 1030 MW 16 June 2010 28 September 2018[3] -
Close

Accidents and incidents

November 4, 2014 — an emergency shutdown of two power units occurred at the Rostov NPP, the supply of electricity to consumers was stopped, it took five to six hours to restore operation. The shutdown of the power units occurred due to the tripping of the protection.[8]

On 21 October 2021, unit 2 at the Rostov Nuclear Power Plant activated emergency shutdown procedures and put on maintenance mode due to a crack in the welded joint on the pipeline and resulting steam leak.[9]

On 31 December 2022, a fire broke out in unit 3's block transformer under maintenance, killing one and severely injuring another.[10]

July 16, 2024 — the power unit of the Rostov NPP was shut down due to the activation of automation due to the malfunction of the turbogenerator. The amount of temporary restrictions in the southern power system immediately after the accident reached 1.5 GW. After restoration works, the deficit decreased to 500 MW. restrictions on electricity consumption were introduced in the southern regions, the lights went out in the temporarily occupied Crimea. [11]