SES-14
From Wikipedia, the free encyclopedia
SES-14 with GOLD (bottom left of spacecraft) | |
| Mission type | Communications |
|---|---|
| Operator | SES |
| COSPAR ID | 2018-012B |
| SATCAT no. | 43175 |
| Website | https://www.ses.com/ |
| Mission duration | 15 years (planned) 7 years, 1 month, 9 days (elapsed) |
| Spacecraft properties | |
| Spacecraft type | Eurostar |
| Bus | Eurostar-3000EOR |
| Manufacturer | Airbus Defence and Space |
| Launch mass | 4,423 kg (9,751 lb) |
| Payload mass | 36.8 kg (81 lb) GOLD[1] |
| Dimensions | 7 m x 5.4 m x 2.7 m |
| Power | 16 kW |
| Start of mission | |
| Launch date | 25 January 2018, 22:20 UTC[2] |
| Rocket | Ariane 5 ECA, VA241 |
| Launch site | Centre Spatial Guyanais, ELA-3 |
| Contractor | Arianespace |
| Entered service | September 2018 |
| Orbital parameters | |
| Reference system | Geocentric orbit |
| Regime | Geostationary orbit |
| Longitude | 47.5° West |
| Transponders | |
| Band | C-band |
| Coverage area | Latin America, Caribbean, North America, Atlantic Ocean, West Africa |
SES-14 is a geostationary communications satellite operated by SES at 47.5° West, replaces NSS-806, and designed and manufactured by Airbus Defence and Space. The satellite launched on 25 January 2018 at 22:20 UTC along with the Global-scale Observations of the Limb and Disk (GOLD) instrument from NASA.[2] It has a mass of 4,423 kg (9,751 lb) and has a design life of at least 15 years.[3]
The launch of SES-14 on 25 January 2018 by an Ariane 5 ECA VA241 suffered an anomaly that resulted in a higher inclination than planned but later recovered. About 9 minutes and 28 seconds after launch, a telemetry loss occurred between the launch vehicle and the ground controllers.[4] As confirmed about 1 hour and 20 minutes after launch both satellites were successfully separated from the upper stage and were in contact with their respective ground controllers, but that their orbital inclinations were incorrect as the guidance systems might have been compromised. Therefore, both satellites conducted orbital procedures, extending commissioning time.[5]