San Emidio Geothermal Plant, in Washoe County, Nevada, is a geothermal power plant with a design capacity of 11.8 megawatts (15,800 hp). The upgraded plant went online on May 25, 2012.[2][3]
- United States
Phase 1 reconstruction: 2012
| San Emidio Geothermal Plant | |
|---|---|
![]() | |
| Country |
|
| Location | Washoe County, Nevada |
| Coordinates | 40.3693°N 119.4057°W |
| Commission date | Empire Geothermal Plant: 1987 Phase 1 reconstruction: 2012 |
| Owner | U.S. Geothermal |
| Power generation | |
| Nameplate capacity | 11.8 MW |
| Annual net output | 64,436 MWh (2018)[1] |
History
The plant is the second to occupy the site. The older 3.6-megawatt (4,800 hp) plant, originally known as the Empire Geothermal Plant, which was sold by Empire Geothermal Power LLC to U.S. Geothermal Inc. in 2008,[4] was commissioned in 1987. Phase I of the reconstruction added an 8.6-megawatt (11,500 hp) generator.[2][3][5][6]
In January, 2020, the BLM initiated an environmental assessment concerning a possible new 40-megawatt (54,000 hp) power plant, substation, as many as 25 geothermal and injection wells, a 7.5 mile above ground pipeline and a 58 mile long power line terminating in Fernley, NV.[7] The powerline will parallel an existing 500kV line and use existing access roads.[7]