The San Isabel Solar Energy Center is a 30 megawatt (MWAC) photovoltaic power station in Las Animas County, Colorado located about 20 miles north of the city of Trinidad. The electricity is being sold to Tri-State Generation and Transmission (aka Tri-State) under a 25-year power purchase agreement.[1][2][3] It is the second solar project, following the Cimarron Solar Facility in year 2010, to be added to the utility cooperative's renewables portfolio.[4]

CountryUnited States
Coordinates37°22′03″N 104°28′04″W
StatusOperational
Quick facts Country, Location ...
San Isabel Solar Energy Center
A view of the project with the Spanish Peaks in the distance.
CountryUnited States
LocationLas Animas County, Colorado
Coordinates37°22′03″N 104°28′04″W
StatusOperational
Construction beganMarch 2016
Commission dateDecember 2016
Construction costUS$60 million
OwnerPSEG Solar Source
Operatorsjuwi O&M Group
Solar farm
TypeFlat-panel PV
single-axis tracking
Site area250 acres (101 ha)
Power generation
Nameplate capacity37.9 MWp, 30 MWAC
Capacity factor27.4 (average 2017-2019)
Annual net output72.0 GW·h, 288 MW·h/acre
Close

Project details

The facility occupies about 250 acres of semi-arid shortgrass prairie on the Colorado south-eastern plains, about 10 miles east of the base of the Rocky Mountains.[1] It uses 120,960 polycrystalline silicon panels (Model SN-72cell: rated 310 Wp, ~16% efficiency) that the manufacturer, S-Energy, claims are less susceptible to potential-induced degradation.[5][6] The panels are mounted in rows onto single-axis trackers to optimize electricity production throughout the day.[7]

The project was developed, constructed, and continues to be operated by Boulder-based juwi Inc., the U.S. subsidiary of the German renewable energy company juwi AG.[2][3][7] Construction began in March 2016 and employed about 400 workers, with Nesco serving as contractor for the civil structures.[8] Commercial operation began in December 2016, with a dedication ceremony on July 14, 2017.[9] The project was financed, and is owned by PSEG Solar Source, a subsidiary of New Jersey's Public Service Enterprise Group. The completed facility cost about US$60 million.[1]

On January 11, 2019 Tri-State and juwi announced their development plan for the 100 MW Spanish Peaks Solar Project, which would be sited adjacent to San Isabel Solar Energy Center. Under their plan, juwi will continue to develop the project and Tri-State would buy the electricity under a 15-year contract. A construction start is being targeted for year 2022, with completion in 2023. If funded, it may be the fourth solar project, following the Alta Luna Solar Facility in 2017, to be added to Tri-State's renewables portfolio.[10][4]

Electricity production

More information Year, Jan ...
Generation (MW·h) of San Isabel [11]
YearJanFebMarAprMayJunJulAugSepOctNovDecTotal
2016 4,287 4,287
2017 2,6784,1725,8376,4437,5968,2327,1405,9755,0055,9273,7813,882 66,668
2018 4,2625,2517,4537,1577,7858,4067,7107,5266,7954,6304,3984,044 75,417
2019 4,3265,4516,3806,5967,3967,8308,0067,6857,4335,5563,9403,452 74,051
2020 4,5534,4157,0817,4378,4657,8717,4897,738
Average Annual Production (years 2017-2019) :72,045
Average Capacity Factor (years 2017-2019) :27.4%