Shanghai Metro AC03
From Wikipedia, the free encyclopedia
Stock typeClass A EMU
In service5 November 2002–present
ManufacturerAlstom and CSR Nanjing Puzhen
DesignerMBD Design[1]
| Shanghai Metro 03A01 AC03 | |
|---|---|
A refurbished 03A01 set at Caoyang Road in December 2025 | |
| Stock type | Class A EMU |
| In service | 5 November 2002–present |
| Manufacturer | Alstom and CSR Nanjing Puzhen |
| Designer | MBD Design[1] |
| Built at | Valenciennes, France Nanjing, China |
| Family name | Metropolis |
| Constructed | 2001–2004 |
| Entered service | 5 November 2002 |
| Refurbished | 2023, 2025 |
| Number built | 168 |
| Number in service | 54 (108 cars out of service, 6 refurbished cars pending for entering service) |
| Formation | Tc-Mp-M+M-Mp-Tc |
| Fleet numbers | 02011–02301, 03011–03961 and 04011–04421 |
| Capacity | 300 per car |
| Operators | Shentong Metro Group |
| Depots | North Jiangyang Road Depot Shilong Road Yard |
| Lines served | 3 |
| Specifications | |
| Car body construction | Aluminum alloy |
| Train length | 139.98 m (459 ft 3 in) |
| Car length | 23.54 m (77 ft 3 in) |
| Width | 3 m (9 ft 10 in) |
| Height | 3.8 m (12 ft 6 in) |
| Doors | Electric doors |
| Maximum speed | 80 km/h (50 mph) |
| Traction system | Alstom ONIX 1500 IGBT-VVVF Refurbished: Alstom OptONIX MG 1500 IGBT-VVVF (Proof of concept program), Zhuzhou CRRC Times Electric tPower-TN28 |
| Traction motors | Alstom 4LCA-2138 3-phases AC induction motors |
| Acceleration | Maximum 0.9 km/(h⋅s) (0.559 mph/s) |
| Deceleration | 1 km/(h⋅s) (0.621 mph/s) (service) 1.3 km/(h⋅s) (0.808 mph/s) (emergency) |
| Electric system(s) | 1,500 V DC |
| Current collection | Single-arm Pantograph |
| Bogies | Alstom B25 |
| Safety system(s) | Current: Alstom SACEM (enhanced fixed-block, ATO/GoA2) Future: CASCO Tranavi Qiji (TACS, DTO/GoA3) |
| Track gauge | 4 ft 8+1⁄2 in (1,435 mm) |
The 03A01 (formerly known as AC03) is a current rolling stock used on Line 3 of Shanghai Metro. They are developed by Alstom and built by CSR Nanjing Puzhen.[2][3] The contract was awarded to Alstom on 11 May 1999.[4] The first train delivered on 5 December 2001[5] and entered service on 5 November 2002.[6]
In 2014, AC03 was renamed as 03A01.[7]