Wikiwand AI

Sijiqing Qiao station

Beijing Subway Line 12 station From Wikipedia, the free encyclopedia

Sijiqing Qiao station (Chinese: 四季青桥站; pinyin: Sìjìqīng Qiáo zhàn) is the western terminus of the Line 12 of the Beijing Subway,[1] which opened on December 15, 2024.

LocationIntersection between West 4th Ring Road North, Tonghui Road (通汇路) and Zhanghua Road (彰化路)
On the border between Shuguang Subdistrict and Sijiqing Area, Haidian District, Beijing
China
Coordinates39.943732°N 116.267568°E / 39.943732; 116.267568
Line     Line 12
Quick facts General information, Location ...
Sijiqing Qiao

四季青桥
Beijing Subway
Platform in December 2024
General information
LocationIntersection between West 4th Ring Road North, Tonghui Road (通汇路) and Zhanghua Road (彰化路)
On the border between Shuguang Subdistrict and Sijiqing Area, Haidian District, Beijing
China
Coordinates39.943732°N 116.267568°E / 39.943732; 116.267568
OperatorBeijing Mass Transit Railway Operation Corporation Limited
Line     Line 12
Platforms2 (1 island platform)
Tracks2
Construction
Structure type
Underground
AccessibleYes
History
OpenedDecember 15, 2024; 20 months ago (2024-12-15)
Services
Preceding station Beijing Subway Following station
Terminus Line 12 Landianchang
towards Dongbabei
Location
Sijiqing Qiao is located in Beijing
Sijiqing Qiao
Sijiqing Qiao
Location within Beijing
Close

Location

It is located under the intersection between West 4th Ring Road North and Tonghui Road and Zhanghua Road. It is in the south of Sijiqing Bridge,[2] where the name of the station comes from.

It is on the border between Shuguang Subdistrict and Sijiqing Area, in Haidian, Beijing.

Exits

There are three exits, lettered A, C and D. Only Exits A and C will be opened with the station on the west side of West 4th Ring Road North, and Exit D on the east side of West 4th Ring Road North will have a delayed opening. Exit A has an accessible elevator.[3]

History

The station was formerly named as "Sijiqing". On 21 July 2023, the station was renamed as "Sijiqing Qiao".[4]

On October 25, 2021, Sui Zhenjiang, then vice mayor of Beijing, conducted a survey at the station, pointing out that the groundwater level of the station had risen by about 11 meters compared with the survey in 2017, which was a test for the safety of subway construction.[5]

Future development

It is proposed to extend Line 12 from here to Haidian Wuluju station to connect to Line 6.[6]

References

Related Articles

Timelines

Top Qs

Fact Checks