The Splityard Creek Dam is a rock and earth-fill embankment dam across the Pryde Creek in the South East region of Queensland, Australia. The sole purpose of the dam is for the generation of hydroelectricity.[1] The impounded reservoir is called the Splityard Creek Reservoir.

CountryAustralia
Coordinates27°22′16″S 152°38′13″E
PurposePower
Quick facts Country, Location ...
Splityard Creek Dam
Splityard Creek Dam is located in Queensland
Splityard Creek Dam
Splityard Creek Dam
Location of the Splityard Creek Dam
in Queensland
CountryAustralia
LocationSouth East Queensland
Coordinates27°22′16″S 152°38′13″E
PurposePower
StatusOperational
Construction began1977 (1977)
Opening date1980 (1980)
Built byThiess Brothers and John Holland
OwnerCleanCo Queensland
OperatorCS Energy
Dam and spillways
Type of damEmbankment dam
ImpoundsPryde Creek
Height76 m (249 ft)
Length1,140 m (3,740 ft)
Dam volume69×10^3 m3 (2.4×10^6 cu ft)
Spillway typeUncontrolled
Spillway capacity570 m3/s (20,000 cu ft/s)
Reservoir
Total capacity28,700 ML (23,300 acre⋅ft)
Catchment area3.8 km2 (1.5 sq mi)
Surface area105 ha (260 acres)
Maximum width294 m (965 ft)
Wivenhoe Power Station
OperatorCS Energy
Commission date1984 (1984)
TypePumped-storage
Turbines2
Installed capacity500 MW (670,000 hp)
Website
Wivenhoe Power Station
Close

Location and features

The dam is located 30 kilometres (19 mi) northwest of Ipswich in the Somerset Region and forms the upper reservoir for the Wivenhoe Power Station.

Construction commenced in 1977 and was completed in 1980 by contractors Thiess Brothers and John Holland.[2] The rock and earthfill dam structure is 76 metres (249 ft) high and 1,140 metres (3,740 ft) long. The resultant reservoir has a capacity of 28,600 megalitres (23,200 acre⋅ft) when full that covers a surface area of 102 hectares (250 acres), and is drawn from a catchment area of 3.8 square kilometres (1.5 sq mi). The uncontrolled un-gated spillway has a discharge capacity of 570 cubic metres per second (20,000 cu ft/s).[1] The asset was transferred to CleanCo Queensland in October 2019.

Power station

Owned by CleanCo Queensland and operated by CS Energy, Wivenhoe Power Station is located on the eastern side of Wivenhoe Dam, north west of Brisbane. The station, which began commercial operation in 1984, was Queensland's first pumped-storage hydro-electric plant. It is operated remotely from an operating centre used to manage the Queensland electricity grid.[3]

The dam's water capacity is enough for the power station to run at full load for approximately ten hours. Using both pumps, this water can be replaced in about 14 hours. The pumped storage power station consists of two circular concrete silos, each of about 32 metres (105 ft) internal diameter. Each of the silos houses a 250 megawatts (340,000 hp) turbine generator and pump set, giving a total capacity of 500 megawatts (670,000 hp).[3]

Recreation

Public access including swimming is banned from the dam due to strong currents and submerged hazards.