Sultan Babullah Airport

Airport in North Maluku, Indonesia From Wikipedia, the free encyclopedia

Sultan Babullah Airport (IATA: TTE, ICAO: WAEE) is a domestic airport serving the island city of Ternate, the largest urban center in North Maluku province, Indonesia. The airport is named after Sultan Babullah of Ternate, the seventh ruler of the Sultanate of Ternate, who resisted Portuguese colonization in the Moluccas during the 16th century and is recognized as a national hero of Indonesia. Located approximately 5 km (3.1 miles) from downtown Ternate, the airport is the largest and busiest in North Maluku and the second-busiest in the Maluku Islands after Pattimura Airport in Ambon. It serves as the main gateway to both the city and the wider North Maluku region. The airport operates flights to major Indonesian cities such as Jakarta, Surabaya, Makassar, and Manado, and also functions as a hub for pioneer routes connecting remote towns and islands across North Maluku that are otherwise accessible only by air.

Quick facts Bandar Udara Sultan Babullah, Summary ...
Sultan Babullah Airport
Bandar Udara Sultan Babullah
Summary
Airport typePublic
OwnerGovernment of Indonesia
OperatorDirectorate General of Civil Aviation
ServesTernate
LocationTernate, North Maluku, Indonesia
Time zoneWIT (UTC+09:00)
Elevation AMSL49 ft / 15 m
Coordinates0°49′55″N 127°22′50″E
Map
TTE/WAEE is located in Halmahera
TTE/WAEE
TTE/WAEE
Location of airport in North Maluku / Indonesia
TTE/WAEE is located in Indonesia
TTE/WAEE
TTE/WAEE
TTE/WAEE (Indonesia)
Runways
Direction Length Surface
m ft
02/20 2,300 7,546 Asphalt
Statistics (2024)
Passengers795,549 (Increase 6.96%)
Cargo (tonnes)7,772.96 (Increase 57.79%)
Aircraft movements9,120 (Decrease 3.61%)
Source: DGCA[1][2]
Close

History

Sultan Babullah Airport in 2006. The former terminal can be seen on the far right

Sultan Babullah Airport was constructed in 1970 and inaugurated in 1971 by then Minister of Transportation, Frans Seda. The airport was built on the site of a former clove plantation and initially featured a runway measuring 1,100 m × 30 m.[3] In the early years of its operation in the 1970s, the airport was still considered a rural airstrip and served only pioneer routes to Ambon and Galela, operated by Merpati Nusantara Airlines using the de Havilland Canada DHC-6 Twin Otter.[4][5] In 1982, the airport was upgraded to accommodate larger aircraft such as the Fokker F27.[6] By the late 1980s, the airport was already connected to major cities in Eastern Indonesia such as Ambon and Manado, with flights operated by Merpati Nusantara Airlines.[7] Along with Pattimura Airport in Ambon, the airport was designated as one of the two main points of entry to what was then Maluku, prior to the creation of North Maluku province, from other parts of Indonesia.[8]

The airport has been the site of several demonstrations over the years, some of which have disrupted air traffic. On 18 January 2005, hundreds of nearby residents occupied the airport in protest over the government’s failure to pay land compensation related to its development.[9] The occupation ended after a representative of the protesters was flown to Jakarta to meet with officials from the Ministry of Transportation.[9] On 22 August 2007, the airport was again the site of a major demonstration that escalated into riots involving more than 1,000 people, linked to the North Maluku gubernatorial elections. Several police officers and protesters were injured, including four rioters who were shot by police.[10] In addition, due to its proximity to Mount Gamalama, an active volcano, the airport has been temporarily closed several times during eruptions.[11]

In 2008, Batavia Air launched the first direct flight between Jakarta and Ternate using a Boeing 737-300.[12] The service continued until 2013, when the airline ceased operations. The Jakarta–Ternate route was briefly taken over by Express Air, which operated Boeing 737-300 or Boeing 737-500 aircraft, though the service was also short lived.[13] Meanwhile, Garuda Indonesia launched its Jakarta–Ternate route in 2010 using a Boeing 737-300, initially with a stopover in Manado,[14] before later upgrading it to a direct service operated by the Boeing 737-800.[15]

In April 2017, ownership of the airport was transferred from the Ternate city government to the Directorate General of Civil Aviation under the Ministry of Transportation.[16]

To accommodate the anticipated growth of tourism in Ternate and North Maluku, plans are being considered to upgrade the airport to international status, along with the introduction of direct flights to destinations such as Australia and Japan.[17]

Facilities and development

In 2000, the government began developing supporting infrastructure at the airport, including extending the runway to 1,420 × 30 m.[18] Due to increasing air traffic demand, the runway was further extended in 2001 to 1,650 × 30 m, followed by another expansion in 2003 to 1,800 × 30 m, and again in 2005 to 2,000 × 30 m, alongside the construction of a new terminal. The runway was later extended to 2,300 × 45 m in 2014, which remains its current configuration.[18]

Currently, the airport has a single runway measuring 2,300 m × 45 m, allowing it to accommodate narrow-body aircraft such as the Boeing 737 and Airbus A320.[19] The runway is planned to be extended to up to 2,400 meters in the future.[20] The airport is also equipped with two aprons measuring 180 m × 90 m, as well as two taxiways measuring 110 m × 23 m and 95 m × 23 m, respectively.[16] The airport's apron is equipped with eight parking stands and two jet bridges connecting the terminal to the apron.[18] The airport also provides aircraft rescue and firefighting (ARFF) facilities.[18]

Construction of a new terminal began in 2006 to address the overcapacity of the existing terminal amid rising passenger numbers, and was completed in 2013. The project had a total investment of up to Rp 92 billion, funded through the North Maluku provincial budget.[21] The new terminal covers an area of 9,600 m² and has the capacity to accommodate up to 400,000 passengers annually.[22] It was subsequently renovated in 2023 with a budget of Rp 41.2 billion funded by the Ministry of Transportation.[23] The former terminal, which covers an area of 2,100 m², is currently used as a cargo facility.[24] A cold storage facility is planned at the airport to support the growing export activities from Ternate.[25]

Airlines and destinations

Statistics

More information Year, Passengershandled ...
Annual passenger numbers and aircraft statistics
Year
Passengers
handled
Passenger
% change
Cargo
(tonnes)
Cargo
% change
Aircraft
movements
Aircraft
% change
2006 202,072 Steady 100.43 Steady N/A Steady
2007 214,551 Increase 6.18 619.30 Increase 516.65 4,854 Steady
2008 198,080 Decrease 7.68 510.95 Decrease 17.50 4,070 Decrease 16.15
2009292,054Increase 47.44578.48Increase 13.226,884Increase 69.14
2010428,884Increase 46.8580.89Decrease 86.028,798Increase 27.80
2011481,685Increase 12.3140.11Decrease 50.419,088Increase 3.30
2012572,531Increase 18.8657.12Increase 42.4111,410Increase 25.55
2013540,988Decrease 5.512,443.53Increase 4177.8910,707Decrease 6.16
2014510,340Decrease 5.673,632.40Increase 48.6511,060Increase 3.30
2015605,547Increase 18.663,315.78Decrease 8.7211,456Increase 3.58
2016756,353Increase 24.902,397.26Decrease 27.7011,174Decrease 2.46
2017834,190Increase 10.293,692.79Increase 54.0411,382Increase 1.86
2018912,320Increase 9.374,158.27Increase 12.6111,458Increase 0.67
2019766,002Decrease 16.043,313.10Decrease 20.339,258Decrease 19.20
2020375,311Decrease 51.003,355.62Increase 1.285,090Decrease 45.02
2021373,333Decrease 0.533,867.40Increase 15.255,536Increase 8.76
2022621,440Increase 66.464,886.17Increase 26.348,708Increase 57.30
2023743,802Increase 19.694,926.17Increase 0.829,462Increase 8.66
2024 795,549 Increase 6.96 7,772.96 Increase 57.79 9,120 Decrease 3.61
Source: DGCA, BPS[2][43]
Close

References

Related Articles

Wikiwand AI