Sumag River Diversion Project
From Wikipedia, the free encyclopedia
Sumag River Diversion Project | |
|---|---|
| Coordinates | 14°56′11″N 121°20′50″E / 14.93639°N 121.34722°E |
| Locale | General Nakar, Quezon |
| Begins | Sumag River |
| Ends | Umiray-Angat Transbasin Tunnel |
| Maintained by | Metropolitan Waterworks and Sewerage System |
| Characteristics | |
| Total length | 600 m (2,000 ft) |
| Diameter | 2.50 m (8 ft 2 in) |
| History | |
| Construction start | 2014 |
| Location | |
![]() | |
The Sumag River Diversion Project (SRDP) is an expansion project of the Umiray-Angat Transbasin Project (UATP) Metropolitan Waterworks and Sewerage System (MWSS) for the supply of the Angat Dam reservoir. The 600 meter long and 2.50 meter diameter tunnel-aqueduct system diverts waters from the Sumag River, a tributary of the Umiray River, east of the Angat Basin. The SRDP is forecasted to add 188 mld to the existing 777.6 mld capacity of the UATP.[1][2][3][4]