Summit Avenue station (MBTA Green Line C branch)

Light rail station in Brookline, Massachusetts, US From Wikipedia, the free encyclopedia

Summit Avenue station is a light rail stop on the Green Line C branch of the MBTA subway system, located in the median of Beacon Street between Winchester Street and Summit Avenue in the Coolidge Corner neighborhood of Brookline, Massachusetts. The stop has two low side platforms that serve the line's two tracks. Summit Avenue is not accessible; a reconstruction for accessibility is taking place in 2026.

LocationBeacon Street at Summit Avenue
Brookline, Massachusetts
Coordinates42.34106°N 71.12573°W / 42.34106; -71.12573
Platforms2 side platforms
Tracks2
Quick facts General information, Location ...
Summit Avenue
An outbound train at Summit Avenue station in 2024
General information
LocationBeacon Street at Summit Avenue
Brookline, Massachusetts
Coordinates42.34106°N 71.12573°W / 42.34106; -71.12573
Platforms2 side platforms
Tracks2
Construction
AccessibleNo
History
RebuiltMay–September 2026
Former namesWinchester Street
Passengers
2011945 daily boardings[1]
Services
Preceding station MBTA Following station
Brandon Hall Green Line Coolidge Corner
Location
Close

History

Reconstruction work in May 2026

Until around 2004, the station was listed as Winchester Street to avoid confusion with Summit Avenue stop on the B branch.[2] The B branch stop was closed as part of a pilot program in April 2004 (after which the C branch stop became Summit Avenue) and permanently closed the following March.[3][4][5]

Track work in 2018–19, which included replacement of platform edges at several stops, triggered requirements for accessibility modifications at those stops.[6] Design work for Summit Avenue and seven other C Branch stations was 15% complete by December 2022.[7] Designs shown in February 2024 called for the platforms to be shifted eastward, with access from both Winchester Street and Summit Avenue.[8] In May 2024, the Federal Transit Administration awarded the MBTA $67 million to construct accessible platforms at 14 B and C branch stops including Summit Avenue.[9]

The MBTA awarded a $41.9 million design-build contract in April 2025.[10] Designs shown in February 2026 called for the platforms to be shifted westward, with access from both Marion Street and Summit Avenue.[11] By March 2026, preliminary construction work was expected to take place in April and May 2026, followed by main construction from July to September 2026.[12] Construction began during a shutdown of the C Branch on May 6–17, 2026.[13] The outbound platform at Summit Avenue is closed from July 20–August 7, 2026, for reconstruction.[14]