Sutherland Road station
Light rail station in Boston, Massachusetts, US
From Wikipedia, the free encyclopedia
Sutherland Road station is a light rail stop on the MBTA Green Line B branch, located in the median of Commonwealth Avenue at its intersection with Sutherland Road, in Brighton, Boston, Massachusetts. The stop consists of two side platforms, which serve the B branch's two tracks. The platforms are at track level and the stop is not accessible.
Brighton, Boston, Massachusetts
Sutherland Road | |||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
An inbound train at Sutherland Road station in April 2017 | |||||||||||
| General information | |||||||||||
| Location | Commonwealth Avenue at Sutherland Road Brighton, Boston, Massachusetts | ||||||||||
| Coordinates | 42.34158°N 71.14635°W | ||||||||||
| Platforms | 2 side platforms | ||||||||||
| Tracks | 2 | ||||||||||
| Construction | |||||||||||
| Accessible | No | ||||||||||
| History | |||||||||||
| Opened | May 26, 1900[1][2] | ||||||||||
| Rebuilt | 2027–2028 (planned) | ||||||||||
| Passengers | |||||||||||
| 2011 | 856 daily boardings[3] | ||||||||||
| Services | |||||||||||
| |||||||||||
| |||||||||||
Track work in 2018–19, which included replacement of platform edges at several stops, triggered requirements for accessibility modifications at those stops.[4] Design for Sutherland Road and four other B Branch stops was 30% complete by December 2022.[5] A design shown in March 2024 called for the platforms to be rebuilt at their current locations.[6] In May 2024, the Federal Transit Administration awarded the MBTA $67 million to construct accessible platforms at 14 B and C branch stops including Sutherland Road.[7] Additional stops were added to the B branch project in 2024.[8][9] As of July 2026[update], the MBTA expects to issue the $73 million design-build contract in August 2026, with construction lasting from mid-2027 to late 2028.[10]