Wikiwand AI

Washington Street station (MBTA)

Light rail station in Boston, Massachusetts, US From Wikipedia, the free encyclopedia

Washington Street station is a surface stop on the Massachusetts Bay Transportation Authority (MBTA)'s Green Line B branch, located in Brighton, Boston. The station is located in the median of Commonwealth Avenue northeast of Washington Street. Washington Street station consists of two side platforms, which serve the B branch's two tracks. The station is fully accessible.

Coordinates42.34389°N 71.14259°W / 42.34389; -71.14259
Platforms2 side platforms
Tracks2
Quick facts General information, Location ...
Washington Street
Facing inbound at Washington Street station in 2016
General information
LocationCommonwealth Avenue and Washington Street
Brighton, Boston, Massachusetts
Coordinates42.34389°N 71.14259°W / 42.34389; -71.14259
Platforms2 side platforms
Tracks2
Connections MBTA bus: 65
Construction
AccessibleYes
History
OpenedMay 26, 1900 (1900-05-26)
RebuiltNovember 2001–March 2002
Passengers
20111,885 (weekday average boardings)[1]
Services
Preceding station MBTA Following station
Sutherland Road Green Line Warren Street
Location
Close

History

The pocket track at Washington Street around the time of its completion

Streetcar service on Commonwealth Avenue between Brighton Avenue and Chestnut Hill Avenue began on May 26, 1900.[2][3] From October 27, 1926, to January 23, 1953, a passing siding was in place just east of Washington Street. It was occasionally used to short turn trains.[3]

In the early 2000s, the MBTA modified key surface stops with raised platforms for accessibility. The renovation of Washington Street - part of a $32 million modification of thirteen B, C, and E branch stations - began in November 2001.[4][5][6] The renovation was completed in October 2002; delays in construction caused cascading delays to similar renovations at Boston University East and Boston University Central.[7] During construction, temporary platforms south of Washington Street were used.

Around 2006, the MBTA added wooden mini-high platforms on the inbound end of both platforms, allowing level boarding on older Type 7 LRVs. These platforms were installed at eight Green Line stations in 2006–07 as part of the settlement of Joanne Daniels-Finegold, et al. v. MBTA.[8][9] The mini-high platforms were removed in 2020 during a trackwork project.[10]

References

Related Articles

Timelines

Top Qs

Fact Checks