Taipingling Nuclear Power Plant

Proposed nuclear power plant in Guangdong, China From Wikipedia, the free encyclopedia

The Taipingling Nuclear Power Plant is a nuclear power station under construction in Huangbu Town, Huidong County, Huizhou city on the coast of Guangdong Province, in southeast China. The plant is owned by CGN Huizhou Nuclear Power Co. CGN originally planned to have AP1000 light water reactors, but later changed plans to the Hualong One design.[1]

CountryPeople's Republic of China
LocationHuangbu, Huidong, Guangdong
Coordinates22°41′40″N 114°59′00″E
StatusOperational
Quick facts Country, Location ...
Taipingling Nuclear Power Plant
CountryPeople's Republic of China
LocationHuangbu, Huidong, Guangdong
Coordinates22°41′40″N 114°59′00″E
StatusOperational
Construction began2019
Construction costUS$12.1 billion
OwnerCGN Huizhou Nuclear Power
OperatorCGN Huizhou Nuclear Power
Nuclear power station
Reactor typeHualong One PWR
Power generation
Units operational2 × 1116 MWe
Units planned2 × 1116 MWe
Units under const.2 × 1116 MWe
Close

Approval for the plant was granted in February 2019 and first concrete for Unit 1 was poured in December 2019. Unit 1 began commercial operation in April 2026.[2]

Approval for units 3 and 4 was granted in December 2023.[3] First concrete for Unit 3 was poured in June 2025.[4]

On May 3, 2026, Unit 2 successfully completed its first fuel loading, and officially entering the nuclear commissioning phase, and connected to grid on July 4, 2026. [5], began commercial operation in August 3, 2026.[6]

In 2026, China's State Council approved the construction of 4 Hualong One & two Huanlong one version 2.0 units for Jinqimen (3 & 4), Taipingling (5 & 6), and Zhuanghe (1 & 2) [7]

Reactor data

More information Unit, Type ...
Unit Type Net Capacity
MWe
Gross Capacity
MWe
Construction start First

criticality

Grid

connection

Operation start Notes
Phase I
Taipingling 1 Hualong One 1116 1200 2019-12-26 2026-02-03 2026-02-13 2026-04-19 [8]
Taipingling 2 Hualong One 1116 1200 2020-10-15 2026-06-25 2026-07-04[9] 2026-08-03 [10]
Phase II
Taipingling 3 Hualong One 1116 1200 10 Jun 2025 2029 [11]
Taipingling 4 Hualong One 1116 1200 10 May 2026 2030 [12] [13]
Phase III
Taipingling 5 Hualong One 2.0[7] 1116 1200
Taipingling 6 Hualong One 2.0[7] 1116 1200