Tappan Street station
Light rail station in Brookline, Massachusetts, US
From Wikipedia, the free encyclopedia
Tappan Street station is a light rail stop on the Green Line C branch of the MBTA subway system, located in the median of Beacon Street east of Tappan Street in Brookline, Massachusetts. The station consists of two side platforms which serve the C branch's two tracks. Tappan Street station is accessible, with raised platforms to accommodate low-floor light rail vehicles.
Brookline, Massachusetts
Tappan Street | |||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
An outbound train at Tappan Street in 2016 | |||||||||||
| General information | |||||||||||
| Location | Beacon Street at Tappan Street Brookline, Massachusetts | ||||||||||
| Coordinates | 42.33852°N 71.13852°W | ||||||||||
| Platforms | 2 side platforms | ||||||||||
| Tracks | 2 | ||||||||||
| Construction | |||||||||||
| Accessible | Yes | ||||||||||
| History | |||||||||||
| Rebuilt | 2026 | ||||||||||
| Passengers | |||||||||||
| 2011 | 674 daily boardings[1] | ||||||||||
| Services | |||||||||||
| |||||||||||
| |||||||||||
Reconstruction

Track work in 2018–19, which included replacement of platform edges at several stops, triggered requirements for accessibility modifications at those stops.[2] Design work for Tappan Street and seven other C Branch stations was 15% complete by December 2022.[3] Designs shown in February 2024 called for the Tappan Street platforms to be widened and rebuilt at their current locations.[4]
In May 2024, the Federal Transit Administration awarded the MBTA $67 million to construct accessible platforms at 14 B and C branch stops including Tappan Street.[5] The MBTA awarded a $41.9 million design-build contract in April 2025.[6] Design work for Tappan Street and Englewood Avenue was complete by September 2025, with the Tappan Street platforms to be widened and rebuilt at their current locations.[7]
By March 2026, reconstruction of Tappan Street station was expected to last from April to July 2026. Tappan Street and Englewood Avenue were planned to be the first stations in the project to be completed.[8] Construction began during a shutdown of the C Branch on May 6–17, 2026.[9] The station remained closed for reconstruction: the inbound platform reopened on June 29 (eight days later than planned), and the outbound platform reopened on July 18.[10][11][12] This made the station accessible, though some items like signage, railings, shelters, and trees were installed later.[13][14]