Tehran Metro Line 7

Metro line in Tehran, Iran From Wikipedia, the free encyclopedia

Line 7, similar to Line 6, and in contrast with Line 3, goes from northwest to southeast and was constructed with modern TBM machines. Its first phase, consisting of 18 km (11 mi) of line and 7 stations, was opened in June 2017.[2] This line has 28 km (17 mi) with 21 stations right now.[3]

Native nameخط ۷ مترو تهران
Termini
Quick facts Overview, Native name ...
Tehran Metro Line 7
Overview
Native nameخط ۷ مترو تهران
OwnerTehran Urban and Suburban Railways Organization (Metro)
LocaleTehran, Tehran Province
Termini
Stations21
Service
TypeRapid transit
SystemTehran Metro
Operator(s)Tehran Urban and Suburban Railways Organization (Metro)
Depot(s)Takhti Depot
History
OpenedJune 10, 2017 (initial)
July 14, 2018 (middle section)
March 16, 2019 (Northern section)
August 19, 2019 (Eastern section)
Technical
Line length28 km (17 mi)
Track gauge1,435 mm (4 ft 8+12 in)
Electrification25 kV AC overhead catenary
Route map
Close

Route

References

Related Articles

Wikiwand AI