Tel Aviv Metro

Planned subway system around Tel Aviv From Wikipedia, the free encyclopedia

Tel Aviv Metro (also MetroTLV) is a subway system being built in the Tel Aviv Metropolitan Area. It will augment the Tel Aviv Light Rail and Israel Railways suburban lines and consist of three underground metro lines and 109 stations to form a rapid transit transportation solution for the city.

Transit typeRapid transit
Number of lines3
Number of stations109
Quick facts Overview, Locale ...
Tel Aviv Metro
Overview
LocaleTel Aviv Metropolitan area
Transit typeRapid transit
Number of lines3
Number of stations109
Operation
Operation will start2032; 6 years' time (2032)
Close
Outline of the Tel Aviv Metro

Construction started in 2025, with the first public opening scheduled for 2032.[1] The legal foundation for building the metro is found in National Outline Plan 70.

History

The plan for the metro was raised in 2015 by the Israeli ministry of finance, bypassing the transportation ministry. The ministry's rationale was that the light rail plan would not be sufficient to answer Tel Aviv's transportation needs as early as the 2020s, when the first lines would be completed. Multiple alternatives were proposed in internal discussions. At the time, the plan was met with surprise by the transportation ministry.[2]

By early 2016, the two ministries agreed on a general outline that would include three of the seven planned light rail lines, in addition to three new metro lines.[3] In September 2016, the government-owned company NTA (Hebrew acronym for Urban Transportation Lines) released a feasibility study tender for the metro lines. The final cost of all lines is estimated at NIS 130–150 billion (USD 4046 billion).[4][5]

In July 2018, NTA published a tender for the planning of the three subway lines.[5] In July 2018, McKinsey submitted a report on the financial aspects of the project to the Israeli government.[6] The architects chosen to head the planning teams are Dana Kehat from Mansfeld–Kehat for M1, Eliezer Armon for M2 and Edna Lerman for M3.[7]

On 15 April 2019, the National Infrastructures Committee approved the route of all three metro lines.[8]

In December 2022, trial excavation to assess the ground conditions to be encountered during the construction of the metro began.[9]

On 29 August 2023, Israeli Transport Minister Miri Regev signed an order allowing land acquisition to build the metro system to begin.[10]

On 18 December 2025, a cornerstone laying ceremony was held to mark the start of construction work on the project in Petah Tikva. The ceremony was attended by Prime Minister Benjamin Netanyahu and Transport Minister Miri Regev.[11][12][13]

Plan

More information Line, Length ...
LineLengthRoute
M1 85 km (53 mi) Ra'ananaHerzliyaRamat HaSharon – Northern Tel AvivTel Aviv UniversityBavliAyalon Highway (Tel Aviv) – Yigal Allon Street – Kiryat Shalom – Central Holon – Central Rishon LeZionNess ZionaRehovot – Bilu Junction
Kfar SabaHod HaSharonIWI Ramat HaSharon – Kiryat Atidim and Ramat HaHayalTel Aviv UniversityBavliAyalon Highway (Tel Aviv) – Yigal Allon Street – Kiryat Shalom – Central HolonRishon LeZion Old Industrial Zone – TzrifinBe'er Ya'akovRamlaLod
M2 26 km (16 mi) Wolfson Medical Center – Central Tel AvivHaKiryaNahalat YitzhakGiv'atayim – South Bnei BrakBar Ilan UniversityGiv'at Shmu'elPetah Tikva
M3 39 km (24 mi) Southern Bat Yam – Southern Holon – Holon Industrial Zone – AzorOr YehudaSheba Medical CenterKiryat Ono – Ramat Siv and Kiryat Aryeh – Northeast Tel Aviv – Glilot – Herzliya Pituah
Sources:[4][5][14]
Close

Costs

The projected cost of the scheme is ILS 150 billion, of which ILS 82 billion would go to the two lines labeled M1, including value added tax.[15]

Within M1, the cost of moving infrastructure would cost ILS 2.5 billion. The 55 stations would cost ILS 19 billion, or approximately US $100 million per station. Tunneling would cost ILS 13 billion, systems would cost ILS 5 billion, and rolling stock – ILS 2.5 billion.[15]

See also

References