Wikiwand AI

The Curse at Alton Manor

Ghost train dark ride From Wikipedia, the free encyclopedia

The Curse at Alton Manor is a dark ride located at the Alton Towers theme park, near the village of Alton, Staffordshire, England. The attraction opened on 18 March 2023. Guests must be at least 0.9 metres tall to ride, and those under 1.1 metres in height are required to be accompanied by an adult.[1][2]

StatusOperating
Opening date18 March 2023
Quick facts Alton Towers Resort, Area ...
The Curse at Alton Manor
An entrance sign which states "Alton Manor". In the background is the ride exterior.
The entrance sign for The Curse at Alton Manor
Alton Towers Resort
AreaGloomy Wood
StatusOperating
Opening date18 March 2023
ReplacedDuel – The Haunted House Strikes Back!
Ride statistics
Attraction typeDark ride, haunted attraction
ManufacturerMack Rides
DesignerMerlin Magic Making
ThemeHaunted
Capacity1,920 riders per hour
Vehicle typeCar
Vehicles35
Riders per vehicle6
Rows2
Riders per row3
Duration6 minutes 15 seconds
Fastrack, Ride Access Pass available
Must transfer from wheelchair
Assistive listening available
Close

The ride originally opened in 1992 as The Haunted House, before a retheme as Duel – The Haunted House Strikes Back! with the addition of interactive laser shooting in 2003. The ride system and building were reused for The Curse at Alton Manor, featuring a completely new theme and scenes. However, the interactive laser element from the previous attraction was removed.[1][3][4]

Development

After an initial teaser, Duel closed on 6 September 2022 and its replacement was announced as The Curse at Alton Manor the following January.[5][6][7] Later details revealed that the ride's new premise would revolve around a character named Emily Alton, based on the little Victorian ghost girl that inhabited a dollhouse in the queue area of both the Haunted House and Duel.[8][9][10] A main theme of the ride is that her spirit seeks revenge for being left alone and neglected in the house.[8] The ride and surrounding grounds include several easter eggs, such as gravestones memorialising former Alton Towers rides.[11][12][13]

As part of the renovation, the laser guns and targets were removed and the ride vehicles restored to six seats. The attraction officially opened to the public on 18 March 2023.[1][14]

References

Related Articles

Timelines

Top Qs

Fact Checks