Wikiwand AI

Thoothukudi Airport

Domestic airport in Thoothukudi, India From Wikipedia, the free encyclopedia

Thoothukudi Airport (IATA: TCR, ICAO: VOTK), formerly known as Tuticorin Airport,[4] is a domestic airport serving the city of Thoothukudi and its adjoining districts of Thoothukudi, Tirunelveli, Tenkasi and Kanniyakumari in Tamil Nadu, India.[5] It is located along the National Highway 7A at Vagaikulam, about 15.6 km (9.7 mi) west of the city centre. The airport was ISO 9001:2015 quality certified on 13 April 2018.[6]

Quick facts Summary, Airport type ...
Thoothukudi Airport
Thoothukudi Vaanoorthi Nilaiyam
Facade of the airport
Summary
Airport typePublic
OwnerMinistry of Civil Aviation
OperatorAirports Authority of India
ServesThoothukudi
LocationVagaikulam, Thoothukkudi district, Tamil Nadu, India
Opened30 April 1992; 34 years ago (1992-04-30)
Time zoneIndian Standard Time (+5:30)
Elevation AMSL39 m (128 ft)
Coordinates08°43′27″N 078°01′33″E
WebsiteThoothukudi Airport
Map
TCR is located in Tamil Nadu
TCR
TCR
Location of airport in Tamil Nadu
TCR is located in India
TCR
TCR
TCR (India)
Runways
Direction Length Surface
m ft
10/28 3,350 10,990 Asphalt
Statistics (April 2025 - March 2026)
Passengers2,90,398 (Increase 26.2%)
Aircraft movements4,366 (Increase 18.8%)
Cargo tonnage16.6 (Increase 27%)
Source: AAI[1][2][3]
Close

History

Thoothukudi Airport was inaugurated in 1992, with the first aircraft, belonging to the regional carrier Vayudoot, landing on 13 April. This service was short-lived and operated only for 14 months.[7] Three years later, NEPC Airlines operated a regular service from Chennai to Thoothukudi via Kochi for about six months. A decade later, Air Deccan began flights to the airport on 1 April 2006.[7]

Facilities

The airport had a 1,350 m (4,430 ft) long, and 30 m (98 ft) wide asphalt runway, which was extended to 3,115 m (10,220 ft) length and expanded to 45 m (148 ft) width in 2025.[7][8] It is equipped with a Cat-I Instrument Landing System.[8] There is a 1,573 m (5,161 ft) long and 23 m (75 ft) wide parallel taxiway, and a 149 m (489 ft) long taxi way linking the main taxiway to the runway. The main apron measuring 191 m × 89 m (627 ft × 292 ft), is capable of accommodating five narrow body aircraft. A separate parking bay measuring 76 m × 91 m (249 ft × 299 ft) can accommodate an additional aircraft, which is linked to the runway by a 244.5 m (802 ft) long taxiway.[8]

In September 2020, the Airports Authority of India (AAI) announced an expansion project that included the expansion of the runway and taxiway, construction of new parking bays, Air Traffic Control (ATC) tower, and terminal building at a total cost of ₹3.81 billion (US$40 million).[8][9] About 600.97 acres (243.20 ha) of land was earmarked for the expansion of the airport, and an additional 110 acres (45 ha) of land was set aside for the usage of Indian Air Force and the Indian Coastguard.[8] The expansion project was initiated on 25 July 2020.[10] A technical block and a fire station were also constructed as a part of the project.[11] Night landing facilities were established at the airport in 2020 with the first night landing on 3 July 2020.[12] Regular night services from the airport started in March 2026.[13]

The new terminal building covers an area of 17,341 m2 (186,660 sq ft), and is capable of handling up to 1,400 passengers per hour. It is equipped with three aerobridges, four entry gates, seven baggage scanners, and 21 check-in counters.[7] Indian prime minister Narendra Modi inaugurated the new terminal building on 26 July 2025.[14]

Airlines and destinations

More information Airlines, Destinations ...
AirlinesDestinations
IndiGoBengaluru,[15] Chennai[16]
Close

See also

References

Related Articles

Timelines

Top Qs

Fact Checks