Tianpingjia station

Guangzhou Metro station From Wikipedia, the free encyclopedia

Tianpingjia Station (Chinese: 天平架站; pinyin: Tiānpíngjià Zhàn; Jyutping: tin1ping4gaa3 zaam6) is a station on Line 6 of the Guangzhou Metro. It is located underground in the Tianhe District of Guangzhou and started operation on 28 December 2013.[1]

Concourse
Chinese天平架站
Hanyu PinyinTiānpíngjià Zhàn
Hanyu PinyinTiānpíngjià Zhàn
JyutpingTin3ping4gaa3 Zaam6
Quick facts Chinese name, Chinese ...
Tianpingjia

天平架
Guangzhou Metro
Platform
Chinese name
Chinese天平架站
Transcriptions
Standard Mandarin
Hanyu PinyinTiānpíngjià Zhàn
Yue: Cantonese
JyutpingTin3ping4gaa3 Zaam6
General information
LocationShatai Road (沙太路) and Xinghua Road (兴华路)
Tianhe District, Guangzhou, Guangdong
China
Coordinates23°09′35″N 113°19′16″E
Operated byGuangzhou Metro Co. Ltd.
Line     Line 6
Platforms2 (1 island platform)
Tracks2
Construction
Structure typeUnderground
AccessibleYes
Other information
Station code619
History
Opened28 December 2013; 12 years ago (2013-12-28)
Services
Preceding station Guangzhou Metro Following station
Shahe
towards Xunfenggang
Line 6 Yantang
towards Xiangxue
Location
Close

Station layout

G - Exits A & B
L1
Concourse
Lobby Ticket Machines, Customer Service, Shops, Police Station, Safety Facilities, Restroom
L2
Equipment Area
- Station equipment
L3
Platforms
Platform 2 arrow for L  6  towards Xunfenggang (Shahe)
Island platform, doors will open on the left
Platform 1  6  towards Xiangxue (Yantang) arrow for R

Entrances/exits

The station has 2 points of entry/exit, located on both sides of Xinghua Road. Exit A is accessible via stairlift.

History

In the 1997 "Guangzhou City Urban Expressway Traffic Network Planning Study (Final Report)", the then Line 7 had a Tianpingjia station, and later in the 2003 plan, the then Line 7 was renamed Line 6, and there was also a Tianpingjia station, and the location of the station was basically the same as the current one. Subsequently, the station officially started construction in 2009.

On 13 September 2012, the station and Donghu Station officially started the installation and construction of power supply equipment.[2] On 9 October 2012, the boring tunnel machine completed the section between Shuiyin Road (now Shaheding and Tianpingjia, marking the completion of the first phase of the line constructed using the tunnel boring method.[3]

On 28 December 2013, the station was put into use with the opening of Line 6 trial operation.[4]

References

Related Articles

Wikiwand AI