Tongchuan Road station
Metro station in Shanghai, China
From Wikipedia, the free encyclopedia
Tongchuan Road (simplified Chinese: 铜川路; traditional Chinese: 銅川路) is an interchange station of the Line 15 and Line 14 of the Shanghai Metro. Located at the intersection of Daduhe Road and Tongchuan Road in the city's Putuo District, the station was scheduled to open in 2020, when both lines were expected to begin operations.[1] However, the station eventually opened on 23 January 2021 following a one-month postponement of the line 15. The station later became an interchange after Line 14 opened on 30 December 2021.[2]
LocationDaduhe Road and Tongchuan Road, Putuo District, Shanghai
China
China
Coordinates31.252570°N 121.392751°E
Platforms4 (2 island platforms)
Platform of Line 15 | ||||||||||||||||
| General information | ||||||||||||||||
| Location | Daduhe Road and Tongchuan Road, Putuo District, Shanghai China | |||||||||||||||
| Coordinates | 31.252570°N 121.392751°E | |||||||||||||||
| Line | Line 15 | |||||||||||||||
| Platforms | 4 (2 island platforms) | |||||||||||||||
| Tracks | 4 | |||||||||||||||
| Construction | ||||||||||||||||
Structure type | Underground | |||||||||||||||
| Accessible | Yes | |||||||||||||||
| History | ||||||||||||||||
| Opened | 23 January 2021 (Line 15) 30 December 2021 (Line 14) | |||||||||||||||
| Services | ||||||||||||||||
| ||||||||||||||||
| ||||||||||||||||
Station layout
| 1F | Ground level | Exits |
| B1 | Concourse | Tickets, Service Center |
| B2 | Platform 1 | ← Line 14 towards Fengbang (Zhenguang Road) |
| Island platform, doors open on the left | ||
| Platform 2 | Line 14 towards Guiqiao Road (Zhenru) → | |
| B3 | Platform 4 | ← Line 15 towards Gucun Park (Shanghai West Railway Station) |
| Island platform, doors open on the left | ||
| Platform 3 | Line 15 towards Zizhu Hi-tech Park (North Meiling Road) → | |
