Tonstad Hydroelectric Power Station
Dam in Agder
From Wikipedia, the free encyclopedia
Tonstad Power Station (Norwegian: Tonstad kraftverk) is a hydroelectric power station located in Sirdal Municipality in Agder county, Norway. The station is in Tonstad, at the northern end of the lake Sirdalsvatnet.
| Tonstad Power Station | |
|---|---|
![]() Interactive map of Tonstad Power Station | |
| Official name | Tonstad kraftverk |
| Country | Norway |
| Location | Agder |
| Coordinates | 58°39′33″N 6°43′01″E |
| Status | Open |
| Opening date | 1968 |
| Owner | Sira-Kvina Kraftselskap |
| Reservoir | |
| Creates | Homstølvatnet (Kvinesdal) |
| Power Station | |
| Hydraulic head | 440 metres (1,440 ft) |
| Turbines | 5 |
| Installed capacity | 960 MW |
| Capacity factor | 45.2% |
| Annual generation | 3800 GW·h |
It has a total installed capacity of 960 megawatts (1,290,000 hp), with 4 units each producing 160 megawatts (210,000 hp) and one unit at 320 megawatts (430,000 hp), all equipped with francis turbines. With an annual production of approximately 3,800 gigawatt-hours (14,000 TJ), it is the largest power station in Norway with respect to annual production (in 2006). It is near the landing point of the 1,400-megawatt (1,900,000 hp) NORD.LINK power cable to Germany.
The powerstation utilises the waterfalls in the Sira and the Kvina river system, with a total height of 440 metres (1,440 ft). An application for an expansion with an additional 960 megawatts (1,290,000 hp) (pumped storage) was sent in 2008. The application is still pending.[1][2]
