The Transperth C-series trains are a class of electric multiple units part of Alstom's X'Trapolis family of trains for Transperth that are being delivered as part of Metronet. The trains are operating on Perth's suburban rail network and entered service on the Yanchep and Mandurah lines on 8 April 2024.

Stock typeElectric multiple unit
In service2024–present
ManufacturerAlstom
Quick facts Stock type, In service ...
Transperth C-series
C-series railcar at Murdoch station
Interior of a C-series train
Stock typeElectric multiple unit
In service2024–present
ManufacturerAlstom
AssemblyBellevue, Western Australia
Built atBellevue Railcar Manufacturing and Maintenance Facility
Family nameX'Trapolis
ReplacedA-series
Constructed2022–2029 (planned)
Entered service8 April 2024
Number under constructionTotal delivery of 246 carriages (41 sets)
PredecessorB-series
Formation6-car sets
Fleet numbers127–
Capacity
  • 336 seated
  • (approx) 1184 total
OperatorPublic Transport Authority
DepotNowergup
Lines served
Specifications
Car body constructionStainless steel
Train length143.35 m (470 ft 4 in)
Car length
  • 24,435 mm (80 ft 2 in) (end cars)
  • 23.62 m (77 ft 5+15⁄16 in) (intermediate cars)
Width2,860 mm (9 ft 4+5⁄8 in)
Height3,941 mm (12 ft 11+3⁄16 in)
EntryLevel
Doors3 per side of car
Wheel diameter850–770 mm (33–30 in) (new–worn)[1]
Wheelbase2,400 mm (7 ft 10+1⁄2 in)
Maximum speed
  • 160 km/h (99 mph)[2]
  • 130 km/h (81 mph) (operational)[3]
Weight245 t (241 long tons; 270 short tons)
Traction motors16 × 6 ECA 3022 A 320 kW (430 hp)[4]
Power output5,120 kW (6,870 hp)
Deceleration0.865 m/s2 (2.84 ft/s2)
Electric system25 kV 50 Hz AC (nominal) from overhead catenary
Current collectionPantograph
UIC classificationBo′Bo′+2′2′+Bo′Bo′+Bo′Bo′+2′2′+Bo′Bo′
BogiesCL 606[1]
Braking systemsRegenerative and disc
Coupling systemDellner[5]
SeatingMixed longitudinal and transverse
Track gauge1,067 mm (3 ft 6 in)
Notes/references
[6][7][8][9]
Close
The driver's cab
A C-series train (left) with its predecessor the A-series (right) in 2023

History

In April 2018, the Public Transport Authority called for expressions of interest to build 41 6-carriage electric multiple units.[10][11] Three consortia were shortlisted to bid:[12][13]

On 18 August 2019, Alstom was announced as the successful bidder.[14] The trains will be assembled in Bellevue. 17 sets will be delivered to provide rolling stock for network extensions as part of the Metronet project, while the other 24 will replace the A-series stock from 2024.[15]

In December 2019, Alstom released details of the contract and early renders of what the new trains will look like. Under the contract, worth approximately €800 million (AUD1.3 billion), Alstom will be responsible for the design, supply, manufacturing, testing and commissioning of 41 six-car electric-multiple-unit (EMU) trains for suburban services and four,[16] three-car diesel-multiple-unit (DMU) trains later named the ADR/ADS class for the Australind. The contract would include 50% local content, twenty years maintenance of the EMU trains and maintenance support services for the DMU trains.[17]

From 3 April to 18 April 2021, a two thirds length mock-up of a single carriage was made available for the general public to view and provide feedback at Yagan Square. Notable features of the new trains include a mixture of high back seats and bench seating, graphical passenger information displays (that are used the same as its predecessors in service), USB ports and hard-worn flooring instead of the carpet-laid floors of previous trains.[7] Later, the train mock-up was seen in the 2023 Perth Royal Show.

On 7 June 2021 (Western Australia Day), the Railcar Manufacturing and Assembly Facility was officially opened at the Bellevue Railcar Depot, and handed over to Alstom to commence manufacturing the trains.[18][19][20] The first train was revealed on 14 August 2022, with twelve months of testing along the Joondalup and Mandurah lines set to occur before they are put in passenger service.[21][22] Testing along the Joondalup line between Clarkson station and Butler station commenced on 23 December 2022.[23]

The trains entered service on the Yanchep and Mandurah lines on 8 April 2024. A commemorative "first journey" occurred the day before on 7 April, with tickets to that open to the public via a lottery.[24][25] As of 26 March 2026, there are nine C-series trains in service, with all current C-series trains used during weekdays, mostly on full line services. On weekends, approximately five C-series trains run on the Yanchep/Mandurah lines.[26]

Since their introduction there have been complaints from passengers about the comfort and utility of the model. This includes complaints about the seats, lack of hanging straps and difficult to use door opening buttons.[27] On 2 April 2025, the Transperth social pages announced that passengers could now "pre select" the doors before the train has fully stopped, similar to the A and B-series trains.[28]