Trianel Windpark Borkum (formerly Borkum West II) is an offshore wind farm near Borkum. Its first phase of 40 turbines rated at a total capacity of 200 MW is operational, with a planned, additional 200 MW in a second phase.[4][unreliable source?] The project was approved for construction in 2008[5] and will cost over €1 billion to construct once fully operational (€900m for phase I alone). Originally known as Borkum West II the name was changed to Trianel Windpark Borkum in early 2013.

CountryGermany
Location45 km North of Borkum island
Coordinates54°02′30″N 6°28′00″E
StatusOperational
Quick facts Borkum West II, Country ...
Borkum West II
CountryGermany
Location45 km North of Borkum island
Coordinates54°02′30″N 6°28′00″E
StatusOperational
Construction beganSeptember 2011
Commission dateJuly 2015 (2015-07)[1]
Construction costEUR900m (Phase 1) ? (Phase 2)
OwnerTrianel + 33 municipal utilities
OperatorTrianel
Wind farm
Typeoffshore
Max. water depth33 m
Distance from shore45 km (65.6 km for center)
Rotor diameter116 m
Power generation
Units operational40 x 5 MW
Make and modelAreva Wind M5000-116[2]
Units planned32 x 6.34 MW[3]
Nameplate capacity200 MW
External links
Websitewww.trianel-borkum.de/en/start.html
Close
Wind farm layout
Trianel Windpark Borkum's location in the wind farms of the German Bight

Phase 1 of the installation was completed in the 4th quarter of 2014 and consist of 40 Areva M5000-116 turbines (5 MW turbines) on Tripod foundations.[2] It was connected to the grid in August 2015.[6] In the six months before March 2016 the wind farm produced 452.33 GWh,[7] i.e. a capacity factor of 51.6%.

The power is delivered via the offshore converter station HVDC DolWin1 to the German onshore Dörpen West substation near Heede.[8]

In September 2016 Senvion was awarded a conditional contract for the second phase, for 32 upgraded 6.2M152 turbines rated at a total capacity of 203 MW. A final investment decision was made in the first half of 2017 after which construction started in early 2018 for a planned completion in the fall of 2019.[3] The wind farm was fully commissioned in 2020 after delays caused by the bankruptcy of Senvion, at a cost of €184/MWh.[9]