Trinity Islands, Manchester
Skyscraper cluster in Manchester, England
From Wikipedia, the free encyclopedia
Trinity Islands is a residential skyscraper cluster under construction in Manchester, England, comprising four towers between 39 and 60 storeys, split across two 2.2-acre (0.89 ha) sites: Trinity Heights at 183 metres (600 ft), Vista River Gardens at 169 m (555 ft), Building C2 at 146 m (479 ft) and Building C1 at 119 m (390 ft).[2][3] The project was designed by SimpsonHaugh and includes 1,950 apartments, with a total build cost of £741 million.[1] As of March 2026, Buildings C1 and C2 have not yet commenced construction.
Vista River Gardens:
topped out
Building C2: proposed
Building C1: proposed
| Trinity Islands | |
|---|---|
Vista River Gardens (left) and Trinity Heights (right) under construction, January 2025 | |
| General information | |
| Status | Trinity Heights: topped out Vista River Gardens: topped out Building C2: proposed Building C1: proposed |
| Type | Residential |
| Location | Water Street, Manchester, England |
| Construction started | 2022 (Vista River Gardens and Trinity Heights) |
| Estimated completion | 2026 (Vista River Gardens) 2026 (Trinity Heights) |
| Cost | £741 million[1] |
| Owner | Starlight Investments (Trinity Heights) |
| Height | |
| Roof | Trinity Heights: 183 m (600 ft) Vista River Gardens: 169 m (555 ft) Building C2: 146 m (479 ft) (proposed) Building C1: 119 m (390 ft) (proposed) |
| Technical details | |
| Floor count | Trinity Heights: 60 Vista River Gardens: 55 Building C2: 48 (proposed) Building C1: 39 (proposed) |
| Design and construction | |
| Architect | SimpsonHaugh |
| Developer | Renaker |
| Structural engineer | WSP |
| Other information | |
| Number of units | 1,950 (proposed) |
In January 2026, the 60‑storey Building D1 topped out and was officially named Trinity Heights, becoming the second-tallest building in Greater Manchester and overtaking both Vista River Gardens and Beetham Tower.[4]
History
Original proposal
The project began when the original developer Allied London proposed five towers on the site, with the tallest – at 67 storeys – reaching a height of 213 m (699 ft).[5][6] If built, this tower would have overtaken Deansgate Square South Tower to be the tallest building in Greater Manchester, as well as the tallest building in the United Kingdom outside London. The scheme would have delivered around 1,390 homes, costing approximately £1.3 billion.[7] This development was approved by Manchester City Council in July 2017.[8]
Revised proposal
The site was subsequently sold to developer Renaker in 2018 for £13.4 million,[9] who redesigned the scheme[2][10] and lodged an application for four towers containing 1,950 apartments with Manchester City Council in December 2021.[11] Planning approval was obtained in February 2022.[12]
Construction
Construction of the first tower, Trinity Islands Building D2 (169 m (555 ft)), renamed Vista River Gardens,[13] began in 2022 and the building topped out in August 2025,[14] with completion expected in 2026.
Construction of the second tower, Building D1 (183 m (600 ft)), was also launched in 2022.[15] The tower topped out in January 2026 and was officially named Trinity Heights, becoming the second-tallest building in Greater Manchester.[4]
Sale to Starlight
In November 2024, the Canadian real estate investment and asset management company Starlight Investments bought Vista River Gardens from Renaker.[1]