Turów Power Station

From Wikipedia, the free encyclopedia

Official nameElektrownia Turów
CountryPoland
Coordinates50°56′45″N 14°54′53″E / 50.94583°N 14.91472°E / 50.94583; 14.91472
Turów Power Station
Official nameElektrownia Turów
CountryPoland
LocationBogatynia, Lower Silesian Voivodeship
Coordinates50°56′45″N 14°54′53″E / 50.94583°N 14.91472°E / 50.94583; 14.91472
StatusOperational
Commission date1962
OwnerPGE
OperatorPGE GiEK – Oddział Elektrownia Turów
Employees1250
Thermal power station
Primary fuelLignite
Power generation
Nameplate capacity1,950 MWe
External links
Websitewww.elturow.pgegiek.pl
CommonsRelated media on Commons

Turów Power Station is a coal-fired power station in Bogatynia, Poland.[1] The power station, operated by state-owned Polska Grupa Energetyczna via Oddział Elektrownia Turów, is fuelled by lignite extracted from the nearby Turów coal mine.[2] Operations at the plant began in 1962. As of 2021 it supplied 5% of Poland's electricity and is the sole provider of heat and hot water to hospitals, schools and homes in Bogatynia.[3]

The plant initially consisted of ten 200 MW units, commissioned from 1962 to 1971. PGE undertook a US$1.6 billion modernization of units 1-6 of the plant in the early 1990s. Units 7-10 have been phased out. Unit 7 was retired in 2003. In 2010, Unit 8 was retired. Units 9 and 10 were decommissioned in 2012–2013. PGE has repowered Units 5 and 6 to co-incinerate biomass, and plans for co-firing of biomass in boilers 1, 2, 3, and 4. Units 1, 2, and 3 have been upgraded from 200 MW to 235 MW each. The plant's remaining six units have a combined capacity of 1,305 MW.

A new 496 MW unit (Unit 11) built by a consortium of Mitsubishi Hitachi Power Systems Europe GmbH (MHPSE), Budimex S.A. and Técnicas Reunidas, SA was brought online in May 2021.[4][5][6]

References

Related Articles