Wikiwand AI

USNS Choctaw County

Spearhead-class expeditionary fast transport From Wikipedia, the free encyclopedia

USNS Choctaw County (JHSV-2/T-EPF-2), (ex-Vigilant) was the second Spearhead-class expeditionary fast transport,.[1] She was operated by the United States Navy's Military Sealift Command and was built by Austal USA at their yard in Mobile, Alabama.[3][4]

Quick facts History, United States ...
USNS Choctaw County in Mayport on 7 October 2014
History
United States
NameUSNS Choctaw County
Namesake
OperatorMilitary Sealift Command
Awarded28 January 2010[1]
BuilderAustal USA
Laid down8 November 2011[1]
Launched1 October 2012[1]
In service6 June 2013[1][2]
Out of service7 July 2025
Renamedfrom Vigilant
ReclassifiedT-EPF-2, 2015
Stricken7 July 2025
Identification
MottoHarvet Peace, Prepare For War
StatusScrapped
General characteristics
Class & typeSpearhead-class expeditionary fast transport
Length103.0 m (337 ft 11 in)
Beam28.5 m (93 ft 6 in)
Draft3.83 m (12 ft 7 in)
Propulsion
  • 4 × MTU 20V8000 M71L diesel engines
  • 4 × ZF 60000NR2H reduction gears
Speed43 knots (80 km/h; 49 mph)
Troops312
Crew41
Aircraft carriedMedium helicopter
Aviation facilitiesHelipad
Close

Capabilities

The Spearhead EPFs can transport US Army and US Marine Corps company-sized units with their vehicles, or reconfigure to become a troop transport for an infantry battalion.[3]

They are equipped with a flight deck for helicopter operations and a folding ramp on the starboard side at the stern for quick loading of vehicles. The ramp is suitable for the types of austere piers and quay walls common in developing countries. EPF has a shallow draft (3.83 metres (12.6 ft)).[5][3]

Construction and career

On 6 October 2011, Secretary of the Navy Ray Mabus announced in Ackerman, Mississippi that the second Expeditionary Fast Transport, previously having been named Vigilant by the United States Army before the transfer of the EPF program to the Navy,[1] would be named USNS Choctaw County.[6] Since the ship was operated by the Military Sealift Command and not the United States Navy itself, it carried the USNS designation and not USS. The ship is named for three U.S. counties, located in Alabama, Mississippi, and Oklahoma,[7] all three of which are named for the Choctaw tribe of American Indians.

The ship was laid down on 8 November 2011 and launched on 01 October 2012 by Austal USA. She was commissioned on 6 June 2013. On 7 July 2025 Choctaw County was stricken from the Naval Vessel Register and marked as "transferred to the Maritime Administration in preparation for disposal."[8] The ship was filmed under tow on the Delaware River on 6 September 2025 and was placed in the James River Reserve Fleet.[9]

References

Related Articles

Timelines

Top Qs

Fact Checks