Ulaanbaatar Cable Car

Gondola lift in Ulaanbaatar, Mongolia From Wikipedia, the free encyclopedia

The Ulaanbaatar Cable Car is a gondola lift system under construction in Ulaanbaatar, Mongolia.

Statusunder construction
Line no.2
LocationUlaanbaatar
CountryMongolia
Quick facts Overview, Status ...
Ulaanbaatar Cable Car
Overview
Statusunder construction
Line no.2
LocationUlaanbaatar
CountryMongolia
TerminiYarmag (1st line)
National Garden Park (2nd line)
Kharkhorin (1st line)
Shangri-La Ulaanbaatar Complex (2nd line)
No. of stations4
Built byPoma, Monnis Engineering
Construction begin4 April 2024
Operation
OwnerUnified Project Management Authority
No. of carriers98 (1st line)
Carrier capacity10 passengers (1st line)
Trip duration12 minutes (1st line)
Technical features
Line length4.2 km (14,000 ft) (1st line)
2.7 km (8,900 ft) (2nd line)
Close

History

The initial route for the first line was Bayankhoshuu and the III microdistrict, but later on changed to Yarmag and Kharkhorin.[1] The groundbreaking ceremony for the first line of the cable car was held on 4 April 2024 at Artsat Valley, Yarmag, Ulaanbaatar.[2] Land acquisition for the construction of the cable car towers have been completed by November 2024.[3]

Technical specifications

The cable car system is being engineered by Poma from France and Monnis Engineering as local subcontractor. It is owned by Unified Project Management Authority.[4]

First line

For the first line, the cable car line will connect Yarmag (at Artsat Yarmag Station) and Unur Khoroolol (at Kharkhorin Station). It will stretch for a length of 4.2 km with two stops in between supported by 19 pylons and crosses Tuul River. It will have a total of 98 cabins with a maximum capacity of 10 passengers per cabin and a total transport capacity of 2,300 passengers per hour. The one-way journey for the trip will take 12 minutes.[2]

Second line

The second line of the cable car will connect the southwest parking lot of National Garden Park and northwest side of Shangri-La Ulaanbaatar Complex. The line will have eight towers with a total length of 2.7 km. It will have a total transport capacity of 3,400 passengers per hour.[5]

Cabins

The cable car cabins will feature heating system for winter months and ventilation for summer months, double power supply for redundancy and safety system.[6]

Finance

The construction project is financed by soft loan from the Government of France.[1][7]