Ulaanbaatar Tram

From Wikipedia, the free encyclopedia

Open2030 (planned)
Statusunder construction
Ulaanbaatar Tram
Улаанбаатар трамвай
Operation
LocaleUlaanbaatar, Mongolia
Open2030 (planned)
Statusunder construction
Lines2
Infrastructure
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
1,000 mm (3 ft 3+38 in) metre gauge 3 ft 6 in (1,067 mm)
Statistics
Route length26 km (16 mi)
Stops39

The Ulaanbaatar Tram (Mongolian: Улаанбаатар Трамвай) is a planned tram in Ulaanbaatar, Mongolia.

In 2025, the project is on the research, feasibility study and design development stage. It is expected to be completed by 2030.[1] On July 9, 2025, the Science and Technology Council of the Ministry of Roads and Transport approved the feasibility study for Lines I and II of the Ulaanbaatar Tram project. Prior to final approval, the study had been reviewed and endorsed by the Ministry’s Sub-council for Railways and verified by the Ministry’s Development Center.[2]

Routes

See also

References

Related Articles

Wikiwand AI