Valencia Metro (Venezuela)

Public Transit system in Valencia, Venezuela From Wikipedia, the free encyclopedia

The Valencia Metro (Spanish: Metro Valencia or Metro de Valencia) is the public mass transit system of Valencia, Carabobo, Venezuela and its suburbs Naguanagua Municipality and San Diego Municipality.

Number of lines
1 (with more planned)[2]
Number of stations
7[2]
Quick facts Overview, Locale ...
Valencia Metro
Coupled Siemens vehicles
Coupled Siemens vehicles
Overview
LocaleValencia, Carabobo, Venezuela
Transit typeRapid transit/Light metro[1]
Number of lines
1 (with more planned)[2]
Number of stations
7[2]
Daily ridership
62,000 (2011)[3]
WebsiteMetro Valencia C.A.
Operation
Began operation
18 November 2007; 18 years ago (18 November 2007)
Number of vehicles
12 Siemens SD-460
2-car trainsets
Technical
System length7.7 km (4.8 mi)[citation needed]
Close
A vehicle at the maintenance facility

Operations

The metro system was officially opened to the public on 18 November 2006 with just 3 of 7 stations along the original 4.7-kilometer (2.9 mi) Line 1 route[2] open for service, and operating for limited hours while providing service free of charge.[3] Normal revenue service with all 7 stations along Line 1[2] began 18 November 2007.

Although the fleet comprises twelve Siemens SD-460 2-car light rail vehicle trainsets, the Valencia system is a light metro,[4][1] running on a completely grade-separated route (other than within its own maintenance yard) that does not share space with any other traffic.

Valencia Metro operates Monday-Friday from 6am to 8:30pm; Saturday, Sunday and holidays from 6:00am to 7:30pm. An adult fare of 0.5 BsF (23 US cents) and a student fare of 0.15 BsF (7 US Cents) is charged to ride the metro. An average of 62,000 passengers are transported daily.

Lines

Currently[when?] the Valencia Metro operates Line 1 for service.

Future

Extension of the existing north-south route - Lines 2 & 3

A further 4.3-kilometer (2.7 mi) section (Line 2)[2] of the same north-south route as Line 1 is under construction,[3] and a third 5.6-kilometer (3.5 mi) section (Line 3)[2] in the engineering and environmental impact phases.[3] Thus, of the full 14.6-kilometer (9.1 mi) north-south route, only 4.7 kilometers (2.9 mi) are currently[when?] in service, with the remaining 9.9 kilometers (6.2 mi) still under construction or in development. Not every segment of construction on this route is an independent "line." When the system is fully completed, it will form a single continuous route, with no transfers necessary to complete a trip along the route.

Line 4

A separate 18.2-kilometer (11.3 mi)[citation needed] east-west Line 4[2] will connect mainly the Valencia Municipality with San Diego Municipality of the same city, and it is in the preliminary planning stage.