Wikiwand AI

Vapi high-speed railway station

Railway station in Gujarat, India From Wikipedia, the free encyclopedia

Vapi high-speed railway station is an under-construction high-speed railway station on the Mumbai–Ahmedabad high-speed rail corridor. This station is located near Chanod Colony, Dungra, Vapi, Gujarat, India. It is the fifth station of the Mumbai–Ahmedabad high-speed rail corridor, after Boisar station and before Bilimora station. The station will have the second depot of the high-speed rail corridor, just north of it near Karvad.[3][1]

LocationChanod Colony, Dungra, Vapi, Gujarat, India
Coordinates20.3272°N 72.9491°E / 20.3272; 72.9491
Elevation53 metres (174 ft)
OperatorNational High Speed Rail Corporation Limited
Quick facts General information, Location ...
Vapi high-speed railway station
General information
LocationChanod Colony, Dungra, Vapi, Gujarat, India
Coordinates20.3272°N 72.9491°E / 20.3272; 72.9491
Elevation53 metres (174 ft)
OperatorNational High Speed Rail Corporation Limited
LineMumbai–Ahmedabad high-speed rail corridor
Platforms2
Tracks2
Construction
Structure type
Elevated
ParkingYes
Other information
StatusUnder construction[1]
History
OpeningAugust 2027; 10 months' time (2027-08)
Route map
Sabarmati Depot and Workshop
Sabarmati
Sabarmati Junction railway station  Red Line  Ahmedabad Bus Rapid Transit System
Ahmedabad
Ahmedabad Junction railway station Kalupur Railway Station metro station Ahmedabad Bus Rapid Transit System
Anand/Nadiad
Maintenance Depot
Vadodara
Vadodara Junction railway station
Bharuch
Surat
Surat Depot
Bilimora
Kharera River [gu]
Maintenance Depot
Vapi
Boisar
Maintenance Depot
Virar
Ulhas River
Thane Depot and Workshop
Thane
7 km (4.3 mi) tunnel
under Thane Creek
Mumbai BKC
Key
Indian Railways
(including Western DFC on the same line)
Western DFC
Western DFC (under construction)
Ahmedabad Metro
Source[2]
Location
Vapi high-speed railway station is located in Gujarat
Vapi high-speed railway station
Vapi high-speed railway station
Location within Gujarat
Vapi high-speed railway station is located in India
Vapi high-speed railway station
Vapi high-speed railway station
Location within India
Interactive map
Close

Construction

The National High-Speed Rail Corporation Limited (NHSRCL) had invited tenders for Package "C4" of the Mumbai-Ahmedabad high-speed rail corridor (MAHSR) in September 2020, with a deadline of around 4 years.[4] In October 2020, Larsen and Toubro won the tender.[5] The NSHRCL signed an agreement with Larsen and Toubro for the design and construction of Vapi station and its depot, Bilimora station, Surat and its depot, Bharuch and Vadodara stations in November 2020.[6] In August 2021, Larsen and Toubro began construction on both the station and its depot, after acquiring 11.7 hectares of land near Chanod Colony in Dungra, with a completion deadline of 48 months. This also marked the beginning of the large-scale construction of the high-speed rail corridor project. The station is slated to be completed by August 2026, the time also slated for opening of the Gujarat section of the high-speed rail corridor.[1][7]

Lines

The station will be served by the Mumbai–Ahmedabad high-speed rail corridor, and will be the fifth station of the Mumbai–Ahmedabad high-speed rail corridor in Vapi.[8][1]

Structure

The station will have two platforms and two tracks for regular services. It will have three levels–the platform, concourse and service floor as the entrance level. The exterior design of the station building will be inspired by the importance and significance of speed. The station area will have 2 platforms of 425 m (1,394 ft) length for 16-coach trains.[9][10]

Features

The station will have all modern and advanced facilities and amenities for customers and passengers, distinct from Indian Railway stations and similar to airports. Its design has been made to accommodate sufficient space for passenger movement and amenities at the concourse and platform areas. There will be ticketing and waiting areas, a business-class lounge, a nursery, restrooms, smoking rooms, information booths, retail centres and a public information and announcement system. Moreover, skylight provisions will be present on the roof and exterior sides for natural lighting and reduced energy usage. The station will be developed as a transport hub through integration with all basic modes of transportation for better, faster and hassle-free connectivity to and from the station, such as autos, buses and taxis. Such features will be available in all 12 stations of the Mumbai-Ahmedabad high-speed rail corridor.[9]

Vapi depot

The depot is being constructed on the lines of Shinkansen train depots of Japan, such as the Niigata depot shown here.

The depot is one of the four planned depots of the Mumbai-Ahmedabad high-speed rail corridor, after Thane, Surat and Sabarmati depots, out of which the depot at Vapi being built near Karvad is the second. It will have all modern and advanced technologies like Shinkansen train depots in Japan, such as maintenance and cleaning of train sets, with inspection bays, washing plants, stabling lines, etc. Unlike Thane and Sabarmati depots, this depot is being constructed relatively smaller in size, because initially, after the opening of the Gujarat section of the Mumbai-Ahmedabad high-speed rail corridor, it will handle trainsets on a large scale for a short period of time, until when the Maharashtra section will be opened. After its opening, the entire high-speed rail corridor will be completed, thus this depot will be converted into a maintenance depot, like the depots at Virar and Bilimora. After conversion, it will have facilities for the stabling of the inspection and maintenance vehicles and material for the maintenance of the track, bridges and overhead equipments. Construction began on the depot in February 2022, after acquiring around 6 hectares of land near Karvad, being constructed by Ircon International. It is part of the high-speed rail corridor project's Package "T-2", which was awarded to Ircon International by the National High-Speed Rail Corporation Limited (NHSRCL) in the same month. The depot is also slated to be completed by the time of the station's completion.[3][11]

Connectivity

Road

The station is being built just next to the Vapi-Silvassa Road, or Gujarat SH-185, towards south. Because of this location, it will be accessible easily from Vapi, Dadra and Silvassa, as well as from the under-construction Delhi–Mumbai Expressway. Most of the stations being built in the Gujarat section of the Mumbai-Ahmedabad high-speed rail corridor are located near or next to state or national highways, in order to provide better and direct connectivity to the stations.[12]

Rail

The nearest railway station after the station's completion will be Vapi railway station, located 7 km (4.3 mi) north-west from the station.

See also

Notes

  1. under construction; open to Bharuch as of October 2026.

References

Related Articles

Timelines

Top Qs

Fact Checks