Wabtec FLXDrive
Class of battery-electric locomotives
From Wikipedia, the free encyclopedia
The Wabtec FLXDrive platform (pronounced "flex-drive") is a class of battery-electric locomotives manufactured by Wabtec's GE Transportation subsidiary beginning in 2019. Using a modified version of the GE Evolution Series platform, FLXdrive is Wabtec's first zero-emissions locomotive, storing energy in 20 racks of lithium-ion battery cells.[1] FLXDrive is a hybrid-electric locomotive, meaning it works in conjunction with traditional diesel-electric locomotives to provide regenerative braking for a train. The first-generation locomotives (with a capacity of 2.4 MWh) are able to operate 30 to 40 minutes at full power when being not connected to another locomotive.[2]
| Wabtec FLXDrive | |||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| |||||||||||
| |||||||||||
| |||||||||||
| |||||||||||
The first prototype locomotive, number 3000, was successfully tested on BNSF Railway in 2021 and found to reduce fuel consumption when paired with conventional diesel-electric locomotives.[2] Since 2020, FLXDrive locomotives have been ordered by Union Pacific, Canadian National, Rio Tinto,[3] BHP, and Roy Hill. The first locomotives are scheduled to enter service in 2023.[4]
In 2022, Wabtec announced a line of battery-electric locomotives including six-axle, four-axle, and foreign market variants.[5] Wabtec plans to market the FLXDrive in tandem with hydrogen-powered locomotives, allowing the two types to complement each other.[6]
On October 31, 2023, Wabtec unveiled the first production FLXDrive locomotive planned for delivery to the Australian Roy Hill ore railway in 2024.[7] That unit, however, was never delivered and is now part of the test fleet. [8]
BHP's locomotives arrived in Port Hedland in November 2025.[9]
Customers
| Owner | Qty. | No. | Notes |
|---|---|---|---|
| GE Transportation | 1 | 3000 | |
| BHP | 2 | 9001, 9002 | |
| Canadian National | 1 | TBD | |
| Rio Tinto | 4 | TBD | Trial cancelled[10] |
| Roy Hill | 1 | 2001 | Never delivered, now GECX 2025 |
| Union Pacific | 10 | TBD | |
| Total | 18 |