Wikiwand AI

Warsaw Spire

Office complex in Warsaw, Poland From Wikipedia, the free encyclopedia

The Warsaw Spire is a complex of neomodern office buildings in Warsaw, Poland, constructed by the Belgian real estate developer Ghelamco.

StatusCompleted
TypeOffice
Architectural style
Neomodern
LocationWarsaw, Poland, Plac Europejski 1, 2, 6
Quick facts General information, Status ...
Warsaw Spire
Warsaw Spire in 2019
Interactive map of the Warsaw Spire area
General information
StatusCompleted
TypeOffice
Architectural style
Neomodern
LocationWarsaw, Poland, Plac Europejski 1, 2, 6
Coordinates52°13′59″N 20°59′5″E
Construction started
2011
Topped-outApril 2015
Completed
2016
Opening12 May 2016
Height
Architectural220 metres (720 ft)
Tip220 metres (720 ft)
Roof180 metres (590 ft)
Technical details
Floor count49
Floor area129,336 m2 (1,392,160 sq ft)
Design and construction
Architecture firm
Jaspers-Eyers Architects
Projekt Polsko-Belgijska Pracownia Architektury
DeveloperGhelamco
Website
warsawspire.pl
References
[1][2]
Close

Description

Surrounding of the complex at Plac Europejski

Located in the Wola district of Warsaw, the complex consists of a 220-metre main tower with a hyperboloid glass façade, Warsaw Spire A, and two 55-metre auxiliary buildings, Warsaw Spire B and C.[3] The main tower is the third tallest building in Poland (after the Varso Tower and the Palace of Culture and Science).[4]

The design of the skyscraper and adjacent buildings was developed by the Belgian architectural studio Jaspers-Eyers Architects, in cooperation with the Polish-Belgian Projekt Polsko-Belgijska Pracownia Architektury. Surrounding the buildings there is a large open plaza, featuring green areas and water elements.[5]

The European Border and Coast Guard Agency (FRONTEX) is headquartered in the Warsaw Spire B.[6][7]

Construction

Construction works began in mid-2011 with the installation of diaphragm walls on five underground floors, where a parking lot was built. On 3 July 2014, a fire broke out on the roof of one of the lower buildings of the complex, causing not much damage.[8]

In December 2014, a large neon sign with the words Kocham Warszawę ("I love Warsaw") was installed by Belgian creative lighting and visual design practice Painting with Light and placed on the upper floors of the partially constructed main tower.[9] In April 2015, after the assembly of the spires, the skyscraper reached its maximum height of 220 metres.[10] A topping out event was held at the Warsaw Spire on 24 April 2015.[11]

The building's neon sign was temporarily removed in early July 2015 due to progress in façade assembly.[12] A more advanced version of the sign returned permanently to the top of the tower in May 2016 for the opening of the building.[13]

Awards

In December 2011, the Warsaw Spire won the Eurobuild Awards 2011 in the category Outstanding Architectural Design of the Year in Poland.[14]

In March 2014, the complex received the BREEAM Excellent certificate during the MIPIM international property fair in Cannes, France.[15]

In 2017, the building received the MIPIM award for Best Office and Business Development in the world during the MIPIM international property fair.[16]

See also

References

Related Articles

Timelines

Top Qs

Fact Checks