Westshore railway station

From Wikipedia, the free encyclopedia

Coordinates39°28′28″S 176°52′42″E / 39.4744°S 176.8783°E / -39.4744; 176.8783
Elevation2 m (6 ft 7 in)
Owned byKiwiRail
DistancePalmerston North 183.8 km (114.2 mi)
Westshore railway station
Westshore railway station in 1972
General information
Coordinates39°28′28″S 176°52′42″E / 39.4744°S 176.8783°E / -39.4744; 176.8783
Elevation2 m (6 ft 7 in)
Owned byKiwiRail
DistancePalmerston North 183.8 km (114.2 mi)
History
Opened20 July 1923
Closed20 June 1988
Services
Preceding station Historical railways Following station
Napier
Line open,
station closed
5.54 km (3.44 mi) towards PN
  Palmerston North–Gisborne Line
KiwiRail
  Bay View
Line open,
station closed
5.96 km (3.70 mi) towards Gisborne
Location

The Westshore railway station served the Napier, New Zealand, suburb of Westshore, on the Napier-Gisborne section of the Palmerston North-Gisborne line, from 1923 to 1988.

The line continued to be used by freight trains and excursions, but beyond Wairoa, the section to Gisborne was closed by slips in 2012 and mothballed. The line was again closed when Cyclone Gabrielle damaged more than 400 sites in February 2023.[1] A decision has not yet (2025) been made on whether to restore or mothball it. The Napier-Wairoa section reopened in 2019 following a $6.2 million investment from the Provincial Growth Fund, though log trains were suspended due to COVID-19 trains until November 2020.[2]

Prime Minister, Sir Joseph George Ward, turning the first sod at Westshore

Westshore station had a shelter shed, platform, loading bank, cattle and sheep yards, latrines and a passing loop for 45 wagons, extended to 51 by 1937. Railway houses were built in 1920, 1922, 1932 and 1954.[3] 2 more concrete platelayers' cottages and a concrete Stationmaster's house were built in 1922.[4]

The Prime Minister, Bill Massey, officially opened the line at its junction in Napier on 14 November 1922,[5] but Napier-Eskdale passenger trains only ran from 20 July 1923, taking 10 minutes from Napier,[6] and a Saturday afternoon return train from Napier to Westshore was trialled in November 1923.[7] A Sunday train was added in 1925,[8] but replaced by a railway bus from February 1930,[9] as it was thought cheaper than running trains.[10] In 1924 almost a mile of line between Westshore and Bay View was undermined by the sea.[11] In 1928 the stockyards were moved to Waipunga.[12] In 1945 a railcar hit a truck at a railway crossing, killing 5 men in the truck, but not injuring any passengers.[13] In 1947 Westshore was scheduled to be 6 minutes from Napier by railcar.[14] Buses now take about 25 minutes for the journey.[15]

Construction

At Westshore on 29 January 1912, Sir Joseph Ward turned the first sod.[16] At the other end of the line, Lord Islington turned the first sod near Kings Road station on Saturday 10 February 1912,[17] though a later diversion of the route resulted in the line not passing through Kings Road. Up to 1922 more had been spent on the section south from Gisborne, than that north from Napier.[18] By 2 September 1912 NZR was reporting offers made for properties,[3] but in October 1912 the new Massey government stopped construction, pending a decision on a bridge or bank across the harbour.[19] Therefore, it wasn't until 13 March 1916 that driving of the first bridge pile began.[20] Rails were laid over the bridge to Westshore in July 1922.[21] In 1922 the river gap at 0 mi 32 ch (0.64 km) had a temporary bridge to allow platelaying, almost to Westshore, to proceed. The Harbour Board filled the main line at 0 mi 55 ch (1.1 km).[4] Ballasting of the line from Napier was done in October 1922.[22] On 3 February 1931 the line subsided between Napier and Bay View due to the Hawke's Bay earthquake. Repair work started,[23] in March[24] and by June 1931 gangs were working on the line from Napier to Bay View, at Eskdale and at Waikoau,[25] but stopped in October 1931[26] a decision confirmed by an unfavourable Railways Board report.[27] In December 1935 the Minister of Public Works, Bob Semple, announced that the new Labour government would complete the line.[28] Work began on 27 April[29] and on 2 July 1936 the Napier–Eskdale Section reopened for goods traffic, worked by PWD. The line was taken over by NZR on Monday 23 August 1937.[3] The first railcar ran from Napier to Wairoa and back on 30 June 1937,[30] but a regular service didn't start until 3 July 1939.[31]

Westshore bridge

References

Related Articles

Wikiwand AI