Winnweiler station

From Wikipedia, the free encyclopedia

LocationBahnhofstr. 1, Winnweiler, Rhineland-Palatinate
Germany
Coordinates49°34′14″N 7°51′22″E / 49.57045°N 7.85613°E / 49.57045; 7.85613
LinesAlsenz Valley Railway (km 16.84) (KBS 672)
Platforms2 (previously 3)
Winnweiler
Deutsche Bahn
Winnweiler station building
General information
LocationBahnhofstr. 1, Winnweiler, Rhineland-Palatinate
Germany
Coordinates49°34′14″N 7°51′22″E / 49.57045°N 7.85613°E / 49.57045; 7.85613
LinesAlsenz Valley Railway (km 16.84) (KBS 672)
Platforms2 (previously 3)
Construction
AccessibleYes
Other information
Station code6804[1]
DS100 codeSWNW[2]
IBNR8006483
Category6[1]
Fare zoneVRN: 869[3]
Websitewww.bahnhof.de
History
Opened29 October 1870
Services
Preceding station Vlexx Following station
Enkenbach RE 15 Rockenhausen
towards Bodenheim
Rockenhausen
towards Koblenz Hbf
RE 17 Kaiserslautern Hbf
Terminus
Preceding station DB Regio Mitte Following station
Münchweiler (Alsenz) RB 65 Imsweiler
towards Bingen Hbf
Location

Winnweiler station is the station of the town of Winnweiler in the German state of Rhineland-Palatinate. Deutsche Bahn classifies it as a category 6 station and it has two platforms.

It is located on the Alsenz Valley Railway (Alsenztalbahn, HochspeyerBad Münster) and was opened on 29 October 1870 with the first section from Hochspeyer to Winnweiler.

The station is located on the north-eastern edge of Winnweiler. There is a pedestrian level crossing at the station. In addition, a bridge crosses the station, connecting the B48 with the village centre.

History

With the opening of the Hochspeyer–Winnweiler section of the Alsenz Valley Railway on 29 October 1870, Winnweiler was connected to the railway network.[4] For about half a year, Winnweiler was the terminus of this line. On 16 May 1871, the line was extended to Bad Münster am Stein and thus completed. Since then, Winnweiler station has been a through station.

At the beginning of the twentieth century, the station had ticket gates like other stations in the Palatinate.[5][6][7] During this time, the station was managed by the Betriebs- und Bauinspektion Kaiserslautern II (operations and construction inspectorate of Kaiserslautern II) and was part of the responsibility of the Bahnmeisterei Rockenhausen (office of the track master of Rockenhausen).[8]

In 1922, the station was integrated into the new Reichsbahndirektion Ludwigshafen (railway division of Ludwigshafen). A year later, the railway workers employed at the railway station were expelled during the operation of the railway by the French military during the occupation of the Palatinate by France.[9] During the dissolution of the railway division of Ludwigshafen, on 1 April 1937, it was transferred to the railway division of Mainz and the Betriebsamtes (RBA) Bad Kreuznach (operations office of Bad Kreuznach).[10][11]

After the Second World War, the newly founded Deutsche Bundesbahn (DB) transferred the station to the Bundesbahndirektion Mainz (Bundesbahn railway division of Mainz), which was assigned all railway lines within the newly created state of Rhineland-Palatinate. As early as 1971, it became a part of the railway division of Saarbrücken with the dissolution of the railway division of Mainz.[12] In 2000, the station, like all stations in the Western Palatinate, became part of the Westpfalz-Verkehrsverbund (Western Palatinate transport association, WVV) at its foundation, but the WVV was absorbed into the Verkehrsverbund Rhein-Neckar (Rhine-Neckar transport association, VRN) six years later. Since the abandonment of passenger operations at the neighbouring Langmeil (Pfalz) station, Winnweiler has been the only railway station within the municipality of Winnweiler that has passenger services.

At the beginning of March 2008, the upgrading of Winnweiler station to provide accessibility began. For total costs of €1,025,000, platform 1 was extended and the island with platforms 2 and 3 was replaced by an outside platform, platform 2. Since then, Winnweiler station has only had two instead of the previous three platforms. The conversion, which was originally intended to cost only €873,000, was completed in July 2008. The official inauguration of the new station took place on 10 September 2008.[13]

Infrastructure

Operations

Sources

Related Articles

Wikiwand AI