Xilin MRT station

Future Mass Rapid Transit station in Singapore From Wikipedia, the free encyclopedia

Xilin MRT station is a future underground Mass Rapid Transit station on the Downtown Line in Singapore.[2] Located in the Xilin subzone of Tampines, the station serves industries around Changi South, as well as the nearby Tanah Merah Country Club. The station is placed at the junction of Xilin Avenue, Changi South Avenue 3 and Laguna Golf Green.

Location301 Xilin Avenue
Singapore 486800
Coordinates1°19′44″N 103°57′54″E
SystemFuture Mass Rapid Transit (MRT) station
Quick facts General information, Location ...
Xilin
 DT36 
锡林
ஸீலின்
Construction site of the station
General information
Location301 Xilin Avenue
Singapore 486800
Coordinates1°19′44″N 103°57′54″E
SystemFuture Mass Rapid Transit (MRT) station
Owned byLand Transport Authority
Operated bySBS Transit DTL Pte Ltd (ComfortDelGro Corporation)
Line
Platforms2 (1 island platform)
Tracks2
Construction
Structure typeUnderground
Depth25m
Platform levels1
ParkingYes
Bicycle facilitiesYes
AccessibleYes
History
Opening2H 2026
ElectrifiedYes
Previous namesChangi South[1]
Services
Preceding station Mass Rapid Transit Following station
Expo Downtown Line
Future service
Sungei Bedok
Terminus
Location
Singapore MRT/LRT system map
Singapore MRT/LRT system map
Xilin
Xilin station in Singapore
Close

History

The extension to the Downtown Line was first announced during the revealing of the Land Transport Master Plan 2013 on 17 January 2013. The line will be extended to what was known as the Eastern Region Line (presently the Thomson–East Coast Line) by 2024, so as to enhance the accessibility between the two rail lines and allow commuters to conveniently make transfers.[3]

This station was first announced on 15 August 2014 as part of the Downtown Line stage 3e, consisting of 2 stations between Xilin and Sungei Bedok, and was expected to be completed in 2024 in tandem with the adjacent East Coast Integrated Depot.[4] Contract T313 for the design and construction of Xilin Station and associated tunnels was awarded to Samsung C&T Corporation for S$834 million on 21 March 2016.[5][6][7] To facilitate the construction of the station, part of Changi South Avenue 3 between Xilin Avenue and Changi South Avenue 2 will be temporarily closed to traffic from 31 January 2017.[8]

Due to challenges of tunnelling near existing critical infrastructure, the station's construction was further delayed to 2026.[9]

References

Related Articles

Wikiwand AI