Xingu-Estreito HVDC transmission line

From Wikipedia, the free encyclopedia

CountryBrazil
General directionNorth-South
FromXingu substation, Anapu, Pará
ToEstreito substation, Ibiraci, Minas Gerais
Xingu-Estreito
Map of Xingu-Estreito
Location
CountryBrazil
General directionNorth-South
FromXingu substation, Anapu, Pará
ToEstreito substation, Ibiraci, Minas Gerais
Construction information
Commissioned12 December 2017
Technical information
Typeoverhead transmission line
Type of currentUHVDC
Total length2,076 km (1,290 mi)
Power rating4000 MW[1]
DC voltage800 kV

The Xingu-Estreito UHVDC transmission line is a 2076 km long 800 kV[1] high-voltage direct current transmission line in Brazil between the Xingu substation at the city of Anapu in the Pará state, 17 km from the Belo Monte Dam, and the Estreito substation at the city of Ibiraci in the Minas Gerais state.[2] It was inaugurated 21 December 2017.[3]