Çanta Wind Farm is a 2014 wind power plant consisting of 19 wind turbines with a total installed capacity of 47.5 MW. The wind farm is in Çanta in the Silivri district of Istanbul Province, northwestern Turkey.
| Çanta Wind Farm | |
|---|---|
The Çanta Wind Farm | |
![]() | |
| Official name | Çanta Rüzgar Enerji Santrali |
| Country | Turkey |
| Location | Çanta, Silivri, Istanbul Province |
| Coordinates | 41°06′50″N 28°03′30″E |
| Status | Operational |
| Construction began | 2012 |
| Commission date | May 31, 2014 |
| Owner | Boydak Enerji |
| Operator | Boydak Enerji |
| Wind farm | |
| Type | onshore |
| Power generation | |
| Units operational | 19 |
| Make and model | Nordex N100/2500 |
| Nameplate capacity | 19 X 2.5 MW |
| Annual net output | 151 GWh |
| External links | |
| Commons | Related media on Commons |
The wind farm was initially projected by Bora Wind Energy Company in 2011. After Boydak Energy Company took over Bora Co., construction began in 2012. The farm went into production in May 2014 with six turbines, each with a capacity to generate 2.5 MW. By the end of June 2014, eight more turbines were in service, increasing the total installed capacity to 35 MW.[1][2]
Location
Technical details
Maximum power output of each of the 19 turbines supplied by Nordex in Germany is 2.5 MW,[4] and the total annual energy production is about 151 GWh.[2] The turbines of type N100/2500 have 100 m (330 ft) rotor diameter.[3][5]
Average annual wind speed at the site is given with 7.5–8.5 m/s (25–28 ft/s).[3][4]