Abukuma Express Line

Railway line in Fukushima & Miyagi Prefectures, Japan From Wikipedia, the free encyclopedia

The Abukuma Express Line (Japanese: 阿武隈急行線, Hepburn: Abukuma Kyūkō-sen) is a railway line in Japan, owned and operated by the third-sector operator Abukuma Express. Opened in April 1968, the line connects Fukushima Station in Fukushima Prefecture and Tsukinoki Station in Miyagi Prefecture. Both of these stations are also on the Tōhoku Main Line operated by East Japan Railway Company (JR East).

StatusOperational
Termini
Quick facts Abukuma Express Line, Overview ...
Abukuma Express Line
(Abukuma Kyuko Line)
Abukuma Express Line AB900 series train at Tsukinoki Station
Overview
StatusOperational
OwnerAbukuma Express
LocaleTohoku region
Termini
Stations23
Service
TypeHeavy rail
History
Opened1 April 1968; 57 years ago (1 April 1968)
Technical
Line length54.9 km (34.1 mi)
Track gauge1,067 mm (3 ft 6 in)
Minimum radius500 m (1,600 ft)
ElectrificationOverhead line, 20 kV 50 Hz AC
Operating speed95 km/h (59 mph)[1]
Route map

0.0
Fukushima
4.7
Yanome Signal
Tōhoku Main Line
Tōhoku Shinkansen
5.6
Oroshimachi
6.5
Fukushima Gakuin-mae
7.5
Senoue
8.6
Mukaisenoue
Tsukinorin Tunnel
Takakonuma Tunnel
10.1
Takako
11.5
Kamihobara
12.8
Hobara
13.9
Ōizumi
15.4
Niida
17.0
Nitta
18.3
Yanagawa
20.0
Yanagawa Kibōnomori
Kōen-mae
22.1
Tomino
25.2
Kabuto
Hadeniwa Tunnel
2,281 m
29.4
Abukuma
37.5
Marumori
39.2
Kita-Marumori
41.6
Minami-Kakuda
43.3
Kakuda
45.2
Yokokura
47.7
Oka
51.3
Higashi-Funaoka
Momoishi River
Tōhoku Main Line
54.9
Tsukinoki
Tōhoku Main Line
Close

Station list

More information Station, Distance from Fukushima km (mi) ...
Close

History

The line opened on 1 April 1968 as the Marumori Line (丸森線), operated by Japanese National Railways (JNR) between Tsukinoki and Marumori. It was originally planned as a bypass between Fukushima and Marumori to relieve congestion on the Tōhoku Main Line, but plans to extend the route were suspended after the Tōhoku Main Line was double-tracked. In September 1981, as JNR's financial situation deteriorated, the line was proposed for closure.[1]

In response, local and prefectural governments along the route established a third-sector railway operator, Abukuma Express, to take over operations. An application for a railway operating license covering the full route between Fukushima and Marumori was submitted on 24 December 1984. The license was granted on 27 February 1985, followed by approval of construction works on 2 March 1985, allowing electrification of the existing section and the resumption of construction on previously unfinished segments.

Ownership of the line was transferred to Abukuma Express on 1 July 1986, with services initially operated as a non-electrified line between Tsukinoki and Marumori using KiHa 22 series [ja] diesel multiple units borrowed from JNR.[1]

The line was extended south to Fukushima Station on 1 July 1988, completing the full route between Fukushima and Marumori. At the same time, the entire line was electrified using a 20 kV 50 Hz AC overhead supply.

Operations were suspended across the entire line following damage from the 2011 Tōhoku earthquake and tsunami on 11 March 2011, with services gradually restored in stages and full operations resuming on 16 May 2011. All services were again suspended on 12 October 2019 due to damage caused by Typhoon Hagibis; partial service resumed later that month, and full operations between Fukushima and Tsukinoki were restored on 31 October 2020. A further suspension occurred following the 2022 Fukushima earthquake on 16 March 2022, with services progressively reinstated and full operations resuming on 27 June 2022.